TG20:13 on the cusp of being released for general sale..

ADVERTISEMENT

TG20:13

As the social media promotion of TG20:13  heats up and the announcement of regional NASC seminars, are we in the final week before the anticipated release of this new technical guidance for scaffolding?

The answer to this question is ‘yes’, rumours are many NASC members have already started to receive their one free copy of the guidance. Once on general sale contractors will be able to purchase the full suite from the NASC website at a rumoured cost of £1,000 for the full four-piece TG20:13 ‘suite’.

ScaffMag will have more confirmed details for our readers early next week after attending a NASC conference in London.

So what is going to be included in the awaited suite?

  1.  TG20:13 Operational Guide. A full-colour, brand new, 224-page guide containing detailed practical guidance for most common types of scaffolding supported by structural research and calculation. Guidance is provided for an expanded range of standard structures which includes independent scaffolding, interior birdcages, chimney stack scaffolds, loading bays, ladder-access towers, free-standing towers, lift shaft towers and putlog scaffolding. A NEW range of TG20 ‘compliance sheets’ is included for these structures.
  2.  TG20:13 Design Guide. Intended predominantly for engineers and designers, this 206-page document provides technical data, commentary, and source material for use by competent and suitably qualified scaffold designers in circumstances which are outside the scope of standard solutions provided in the TG20:13 Operational Guide and TG20:13 e-Guide software.
  3. TG20:13 e-Guide. Designed for Mac, PC and tablet use, making it extremely easy to check scaffolds for TG20:13 compliance digitally, with user-friendly software which will facilitate printing and circulation of details of TG20 compliant structures by email. The TG20:13 e-Guide calculates and prints compliance sheets for TG20 compliant scaffolding. It allows TG20 to incorporate a wide range of scaffolding configurations, and calculates safe heights, tie duties and leg loads.
  4. TG20:13 User Guide. A 32-page, full-colour pocket guide in A6 format. This document summarises clearly the requirements for TG20 compliant scaffolding and offers indispensable guidance to the scaffolding operative on-site.

 

 

 

SM Newsdesk
SM Newsdeskhttps://www.scaffmag.com
The staff at ScaffMag.com the leading scaffolding site for a digital generation.

Most popular ↑

Mace Dragados seeks scaffold contractor for £5m HS2 Euston package

Mace Dragados is inviting bids for a £2.5m–£5m scaffolding package supporting demolition work at HS2 Euston, with submissions due by noon on 27 November.

NASC ends muddle over ‘basic’ scaffolding definition

The trade body for scaffolding contractors has launched an...

Scaffolding author and consultant Terry Marks has died

The London-trained scaffolder spent nearly 60 years in the trade and wrote one of its best-known handbooks.

Scaffolding supplier Tube Monkeys goes into liquidation

Kent-based Tube Monkeys Scaffolding Supplies has entered voluntary liquidation, with company documents estimating a £142,000 shortfall for creditors.

OSHA investigates contractor after New York scaffold collapse

OSHA has opened a probe into the New York scaffold collapse. Media reports on 15 November said the search for Diogo De Oliveira was continuing.

Latest news

Scaffolding insolvencies rise 26% as wider construction total falls

Fifty-eight scaffold erection companies in Great Britain entered insolvency in the year to October, up from 46 a year earlier.
- Advertisement -
More from

Thinking Pink: How Southern Hoist Services Is Taking Social Value to New Heights

Southern Hoist Services says its pink hoist hire campaign has raised £10,000 for breast cancer causes, with a larger hoist set to join the fleet.

Scaffolding supplier Tube Monkeys goes into liquidation

Kent-based Tube Monkeys Scaffolding Supplies has entered voluntary liquidation, with company documents estimating a £142,000 shortfall for creditors.

Construction loses 2.1 million working days to injury and ill health

Illness accounts for four-fifths of construction’s lost working days, according to new HSE figures.

OSHA investigates contractor after New York scaffold collapse

OSHA has opened a probe into the New York scaffold collapse. Media reports on 15 November said the search for Diogo De Oliveira was continuing.
Latest articles