Switzerland’s scaffolding trade body has introduced a new agreement to help contractors and clients make sure platforms used to store building materials are used safely.
Developed by the Swiss scaffolding contractors’ association, SGUV, with accident insurer Suva, the document sets out loading limits and the responsibilities of those erecting and using the scaffold. SGUV announced the agreement on 10 November.
It is a Swiss initiative and does not change UK requirements. But it addresses issues familiar to British scaffolding firms: making sure clients understand what a platform can carry, how it should be used and when to call the scaffolder back.
The three-page agreement sits alongside the handover record and load signs. It gives the scaffolding contractor and client a written record of the permitted use, with space for inspection results, defects and any work needed before use.
One point concerns platforms positioned above and below one another. Users cannot assume every level can be fully loaded at the same time. The approved loading arrangement must be shown on the relevant signs.
The document also says materials should be spread evenly across the designated area. Heavy loads concentrated in one spot need specific approval.
Responsibilities are divided between the scaffold contractor and the client. The contractor must hand over an inspected scaffold and explain any changes to its loading limits. The client must brief users, keep within those limits and report damage or unauthorised alterations.
Access routes and fall protection must remain clear and usable. The agreement also requires work on the platforms to stop during storms, strong winds or icing. These provisions are set out in the SGUV agreement.


