John Brash take the lead in fire safety scaffold boards

ADVERTISEMENT

 

John Brash (www.JohnBrash.co.uk), the UK’s leading manufacturer of graded timber scaffold boards, roofing battens, shingles & shakes, and commercial anti-slip decking; launches ‘JB FireSafe’ into their scaffold board product range.

 JB FireSafe is a new breed of fire retardant scaffold board, manufactured and treated on-site, having been specifically developed to meet the increasing demand for fire retardant treatments across multiple sectors, including high-risk environments such as London Underground, or on and off-shore oil and gas plants among others.

These new facilities see John Brash become the first, and only, European manufacturer of timber scaffold boards to install a dedicated, state of the art on-site fire retardant treatment facility.

JB FireSafe will be treated under a vacuum pressure impregnation system with Osmose FirePRO, recognised by the industry as the optimal treatment of timber scaffold boards. With its high technical specification, Osmose FirePRO is approved by London Underground, among others, as having appropriate fire retardancy for use in all their construction and maintenance projects.

Critically JB FireSafe Scaffold Boards, as well as being graded to BS2482:2009, use a WPA ‘HR Approved & Listed’ product. This ensures the treatment is optimal for the scaffold board. Some treatments can be hygroscopic and quickly effervesce, leaching out and reducing the fire retardant properties.

Christian Brash says, “As one of the UK’s principal manufacturers of scaffold boards, we have built a fantastic reputation and the John Brash scaffold boards are now recognised as the premier board on the market. Our new facilities mean that we can now be certain to stay at the forefront of fire treatment technology, as well as maintaining ultimate quality control, passing numerous benefits directly on to our clients. Not all fire retardant treatments are the same, and we’re thrilled to now be able to offer the optimal treatment to our clients through JB FireSafe.”

JB FireSafe offers:

  • Reduced lead time due to a shorter supply chain
  • Streamlined logistics and costs
  • Treatment to Euroclass ‘B’ or ‘C’ (equivalent to BS476 Class 0 or 1)

 

Please visit www.johnbrash.co.uk for further information on JB FireSafe, or any of the other John Brash products.

 

SM Newsdesk
SM Newsdeskhttps://www.scaffmag.com
The staff at ScaffMag.com the leading scaffolding site for a digital generation.

Most popular ↑

CISRS says CSCS notice was served to negotiate “from a stronger position”

NASC president Sarah Klieve says CISRS served CSCS notice to negotiate from a stronger position, as Build UK says the card rules don’t block other sectors.

86m Layher scaffold completed at Giotto’s Bell Tower

An 86-metre scaffold erected in just over four months will support a five-year restoration of the Florence landmark while keeping it open to visitors.

WorkSafe targets fall risks on New Zealand residential sites

WorkSafe New Zealand is inspecting residential sites from October to December, with falls from height accounting for 70% of construction prohibition notices.

Scottish scaffolding apprentices to compete at ScaffChamp 2026

A team of young scaffolders from Scotland and Northern...

Scaffold Innovations: GapClamp™

  Since the Work at Height Regulations 2005 came into...

Latest news

Lee Marley turnover hits £95.4m as profit falls

The masonry and scaffolding contractor invested £2.99m in scaffold and other fixed assets and entered 2026 with £131m of secured work.
- Advertisement -
More from

GKR scaffolders help save woman’s life at London project

A GKR Scaffolding site team has been praised after helping to save the life of a woman who collapsed...

Wayne Connolly honoured as NASC opens 2026 awards entries

NASC has opened entries for the 2026 Scaffolding Excellence Awards, with this year’s apprentice category renamed in memory of...

Robot named Douglas begins work on Tilbury Douglas site

Tilbury Douglas has begun using a humanoid robot to carry out administrative and data-collection tasks on a live construction...

CISRS proposes single global scaffolding training standard by 2028

CISRS has set out plans to reform its Overseas Scaffolder Training Scheme, with proposals that would lead to a...
Latest articles