Saudi firm breaks 27-year-old scaffolding world record

Saudi scaffolding firm Manar Al Omran has set a new Guinness World Record after building a 67.40m free-standing scaffold in Dammam, beating a UK record that had stood for almost 27 years.

ADVERTISEMENT

The structure was officially verified by Guinness World Records on 23 September at Manar Al Omran’s premises in Dammam, Saudi Arabia.

At 67.40m, the tower beats the previous 58.50m record set in the UK in 1999.

Manar Al Omran, known as MAO, said the structure was completely free-standing, with no ties, anchors or supporting structure. It was built using the company’s own Ringlock scaffold system and designed specifically to exceed the previous world record.

67m tower built in six days

The scale of the structure is considerable. Its base measures 43.47m by 43.47m, while the completed tower weighs 332.87 tonnes and contains 35,172 individual scaffold components.

MAO said the structure was erected in just six days.

An average of 80 workers were involved each day, working across two shifts, with the build accounting for around 4,800 man-hours. The company said the scaffold was engineered to deal with dead, live and wind loads, with checks carried out to confirm load-bearing capacity and stability throughout the structure.

MAO also said the entire installation was completed with zero lost-time incidents.

‘A proud moment for MAO’

Maher Al-Harbi, Chairman of MAO Group, said: “This record was built by our people. Every meter of this tower stood on the engineering, the material and the discipline of the meters below it, and our engineers, supervisors and workers delivered it safely in six days.

“It is a proud moment for MAO and for Saudi industry, and a clear demonstration of the manufacturing and engineering capability being built in the Kingdom under Vision 2030.”

Video released following the attempt shows the completed scaffold, the Guinness World Records adjudication and the certificate presentation.

The new record raises the previous height by 8.90m.

MAO said the final Guinness World Records reference number and online record page are still to be issued alongside the final certificate.

Daniel Norton
Daniel NortonFounder & Editorhttps://www.scaffmag.com
Daniel Norton is the founder and editor of Scaffmag and Editor-in-Chief of Scaffold & Access Magazine. A former scaffolder, he founded Scaffmag in 2008 and now leads its news and editorial coverage of the global scaffolding and access industry, including safety, regulation, business, innovation and major industry events.

Most popular ↑

Mace Dragados seeks scaffold contractor for £5m HS2 Euston package

Mace Dragados is inviting bids for a £2.5m–£5m scaffolding package supporting demolition work at HS2 Euston, with submissions due by noon on 27 November.

NASC ends muddle over ‘basic’ scaffolding definition

The trade body for scaffolding contractors has launched an...

Scaffolding supplier Tube Monkeys goes into liquidation

Kent-based Tube Monkeys Scaffolding Supplies has entered voluntary liquidation, with company documents estimating a £142,000 shortfall for creditors.

Scaffolding insolvencies rise 26% as wider construction total falls

Fifty-eight scaffold erection companies in Great Britain entered insolvency in the year to October, up from 46 a year earlier.

SG4:10 We Think The Answer Is Fast Guard™

If Carlsberg made advance guardrails.....  could this be the...

Latest news

TRS wins £255,000 scaffold job at listed Bristol hotel

Homes England has appointed TRS Group (South West) to carry out scaffolding works after an inspection condemned the existing scaffold at the former George Railway Hotel.
- Advertisement -
More from

The scaffolding behind London Museum’s Smithfield opening

London Museum opens at Smithfield on Saturday. JDC Scaffolding used a 3,000-board working deck and six temporary roofs during the restoration.

Thinking Pink: How Southern Hoist Services Is Taking Social Value to New Heights

Southern Hoist Services says its pink hoist hire campaign has raised £10,000 for breast cancer causes, with a larger hoist set to join the fleet.

Scaffolding supplier Tube Monkeys goes into liquidation

Kent-based Tube Monkeys Scaffolding Supplies has entered voluntary liquidation, with company documents estimating a £142,000 shortfall for creditors.

Construction loses 2.1 million working days to injury and ill health

Illness accounts for four-fifths of construction’s lost working days, according to new HSE figures.
Latest articles