Storm Austen brings amber wind warning for south-west England

An amber wind warning runs from 01:00 to 10:00 BST on Friday 23 October, with gusts around 80mph possible on exposed headlands.

ADVERTISEMENT

An amber wind warning for Storm Austen has put parts of south-west England on notice for potentially damaging gusts on Friday 23 October.

The Met Office warning, updated on Thursday 22 October, runs from 01:00 to 10:00 BST on Friday. Its start has been brought forward by two hours. It lists Cornwall, Devon, Plymouth and the Isles of Scilly among the affected local authority areas.

Forecasters expect gusts of 60–70mph widely for a time, with around 80mph possible on exposed headlands. Heavy rain is also forecast.

The Met Office warns of likely flying debris, possible building damage and disruption to transport and power supplies. Winds are expected to ease gradually later on Friday.

Preparations on Scilly

In a notice published on 21 October, the Council of the Isles of Scilly advised people to take precautions they can safely carry out to secure unstable structures before the warning period.

The council said storm boards would be installed on St Mary’s by 17:00 on Thursday to reduce wind-blown sand and debris entering roads and drains.

For scaffolding contractors in the affected areas, the warning is a timely consideration for site planning and securing materials ahead of Friday morning.

Wider wind warning

The wider yellow wind warning for southern England and Wales has been expanded to cover western Wales and extended to 17:00 BST on Friday. In its update on Thursday 22 October, the Met Office also announced a further yellow wind warning for a large area of England and Wales, running from 10:00 to 21:00 BST on Friday, with gusts of 45–55mph forecast.

Warnings can change. Contractors should check the current Met Office warning map and local forecasts for their sites.

Daniel Norton
Daniel NortonFounder & Editorhttps://www.scaffmag.com
Daniel Norton is the founder and editor of Scaffmag and Editor-in-Chief of Scaffold & Access Magazine. A former scaffolder, he founded Scaffmag in 2008 and now leads its news and editorial coverage of the global scaffolding and access industry, including safety, regulation, business, innovation and major industry events.

Most popular ↑

Worker dies and another missing after New York bridge scaffold collapse

Developing: One worker died and another remained missing after scaffolding collapsed at the Loop Parkway Bridge on Long Island.

NASC warns on scaffold loads and driver fatigue

NASC highlights load security, fatigue and vehicle checks as a new free Truck Driver Toolkit puts scaffolding transport risks in focus.

Taylor Wimpey scaffolders’ pay dispute moves to strike ballot

Unite says voting in the Sunderland pay dispute opened on 9 November and closes on 23 November. The dispute involves 19 scaffolders and 31 joiners.

Taylor Wimpey opens redundancy talks over local team changes

Taylor Wimpey is consulting staff over local team changes that could lead to redundancies. The number of roles affected has not been disclosed.

NASC ends muddle over ‘basic’ scaffolding definition

The trade body for scaffolding contractors has launched an...

Latest news

Investigation after Chatham scaffolder dies in Plumstead fall

Steven Farr, 47, died after a fall while erecting scaffolding in Plumstead. HSE and the Metropolitan Police are investigating, KentOnline reports.
- Advertisement -
More from

Investigation after Chatham scaffolder dies in Plumstead fall

Steven Farr, 47, died after a fall while erecting scaffolding in Plumstead. HSE and the Metropolitan Police are investigating, KentOnline reports.

Chris Woodley joins CISRS to lead Train the Trainer pilot

Chris Woodley will lead CISRS's four-week Train the Trainer pilot, helping develop instructors and improve consistency across scaffolding training.

Microsoft outage disrupts scaffolding firms as NASC offers access support

NASC offers urgent compliance-sheet access support as Microsoft email disruption prompts scaffolding and construction suppliers to use alternative contact channels.

Tyne Bridge teams hit 70% protection deck target

ISS prepared and delivered more than 200 tonnes of scaffolding as teams completed 70% of the Tyne Bridge protection deck during its ten-day closure.
Latest articles