Notre Dame still at risk from tons of fire-damaged scaffolding

ADVERTISEMENT

Experts have said the Notre Dame cathedral is still at risk from the fire-damaged scaffolding that hangs above it.

Over 550 tons of fused and melted scaffold is currently hanging in the balance over the Paris monument’s roof that was destroyed in a huge fire six months ago.

French authorities have said that the tangled mess of scaffolding poses the biggest challenge to efforts to ensure that Notre Dame’s vaulted ceiling doesen’t collapse.

The scaffold needs to be dismantled without pieces falling into the building, says Christophe-Charles Rousselot, the head of the Notre-Dame Foundation.

ScaffMag understands that it will take several months to remove the fire-damaged scaffold. Another scaffold will be built above it, where workers will rappel down to carefully cut and remove the tubes one by one.

Image Credit: STEPHANE DE SAKUTIN/AFP/Getty Images

Boarding will also be installed above and below the vaulted ceiling for protection and to study in more detail what state it’s in.

The huge fire in April started on the roof, which was partly covered with the scaffolding as restoration work was underway.

 

 

Most popular ↑

ScaffEx26 completes conference line-up ahead of Manchester show

ScaffEx26 has completed its conference line-up ahead of the...

Altrad to merge Generation and TRAD UK under single brand

Altrad has announced it will merge Generation Hire &...

Brogan Group reaches 5 million hours without reportable injury

The scaffolding and access contractor has recorded no reportable...

JR Scaffold secures MoD Gold Award for Armed Forces support

JR Scaffold has been awarded Gold status in the...

Avontus unveils AI platform linking scaffold design, inventory and business data

Avontus has unveiled a new artificial intelligence platform designed...

Latest news

ADVERTISEMENT
More from
Latest articles

NASC and CISRS put industry guidance behind new AI assistant

The new tool allows users to ask questions in their own words and search...

Access Association of Canada honours ‘Dr. Scaffold’ Alan Osborn

Alan Osborn has been made an honorary member of the Access Association of Canada...

Brogan Group reaches 5 million hours without reportable injury

The scaffolding and access contractor has recorded no reportable injuries since 2023 across its...

JR Scaffold secures MoD Gold Award for Armed Forces support

JR Scaffold has been awarded Gold status in the Ministry of Defence Employer Recognition...

ScaffEx26 completes conference line-up ahead of Manchester show

ScaffEx26 has completed its conference line-up ahead of the two-day industry event at Manchester...

PLT Training invests £200,000 to secure PASMA accreditation

The Oldbury-based provider has opened a dedicated tower training area and recruited 3 instructors after gaining approval to deliver PASMA-accredited courses.

Altrad to merge Generation and TRAD UK under single brand

Altrad has announced it will merge Generation Hire & Sales and TRAD UK into...

SAIA names 2026 Project Award winners at Nashville convention

The Scaffold & Access Industry Association has named the winners of its 2026 Project...