Scaffolder fined after woman is injured by unguarded scaffolding tube

ADVERTISEMENT

A Scottish court yesterday fined a self employed scaffolder after he failed to apply numerous safety precautions resulting in the head injury of a pedestrian.

The Health & Saftey Executive (HSE) reported that Thomas Hannen was contracted by Argyll and Bute Council in January 2011 to erect scaffolding around the disused Royal Hotel on Rothesay seafront, on the Isle of Bute, so the council could assess the building’s condition.

Early on 26 January, Mr Hannen and two scaffolders began erecting the scaffolding. Members of the public were not excluded, or in any way actively discouraged, from using the pavement beneath the work area.

Later that morning a council surveyor visited the site and drew Mr Hannen’s attention to an upright scaffolding tube that was obstructing the pavement. Before he left the site he mentioned to Mr Hannen that it was a busy pavement and that he should ensure people were safe.

As a result, a scaffolding tube was placed horizontally between two of the upright standards at a height of about 1.5 metres above ground level. No padding or warning tape was wrapped around it to soften any inadvertent contact, make it easily visible or to alert members of the public to its presence.

Later that morning, a 61-year-old local woman walking underneath the scaffolding, hit her head on the horizontal tube. She was taken to hospital with a head injury which required stitches, and more seriously, fractures to her left ankle caused by her falling as a result of her impact with the pole.

An investigation into the incident by the Health and Safety Executive (HSE) found that Thomas Hannen failed to:

  • take advantage of the offer made to him by the local authority building standards officer to have the footpath where he was working temporarily closed;
  • complete any risk assessment or, alternatively, any risk assessment that was completed appears to have been wholly inadequate and did not guard against risk to pedestrians;
  • erect a scaffold on a pavement with any diversion in place to exclude members of the public from the work area;
  • display any warning signs alerting the public that it was dangerous to be in the work area such as putting padding or warning tape around any of the scaffolding tubes prior to the incident;
  • instruct his workers to attach padding or tape around the scaffolding under erection.

Thomas Hannen, 62, of, Ascog, Rothesay, was fined £1,670 after pleading guilty to breaching sections 3(2) of the Health and Safety at Work etc Act 1974.

[quote type=”center”] Anyone planning construction work in public places should ensure they carry out a risk assessment that identifies potential dangers to members of the public and take adequate steps to prevent them.  [/quote]

After sentencing, HSE Inspector Gerry Muir, said:

“This was an awful accident to a member of the public that could easily have been avoided had Mr Hannen taken some simple, readily available precautions.

“Anyone planning construction work in public places should ensure they carry out a risk assessment that identifies potential dangers to members of the public and take adequate steps to prevent them.”

 

Let us know your thoughts on this in the comments below.

SM Newsdesk
SM Newsdeskhttps://www.scaffmag.com
The staff at ScaffMag.com the leading scaffolding site for a digital generation.

Most popular ↑

OSHA investigates contractor after New York scaffold collapse

OSHA has opened a probe into the New York scaffold collapse. Media reports on 15 November said the search for Diogo De Oliveira was continuing.

NASC ends muddle over ‘basic’ scaffolding definition

The trade body for scaffolding contractors has launched an...

Mace Dragados seeks scaffold contractor for £5m HS2 Euston package

Mace Dragados is inviting bids for a £2.5m–£5m scaffolding package supporting demolition work at HS2 Euston, with submissions due by noon on 27 November.

Scaffolding author and consultant Terry Marks has died

The London-trained scaffolder spent nearly 60 years in the trade and wrote one of its best-known handbooks.

Scaffolding supplier Tube Monkeys goes into liquidation

Kent-based Tube Monkeys Scaffolding Supplies has entered voluntary liquidation, with company documents estimating a £142,000 shortfall for creditors.

Latest news

The scaffolding behind London Museum’s Smithfield opening

London Museum opens at Smithfield on Saturday. JDC Scaffolding used a 3,000-board working deck and six temporary roofs during the restoration.
- Advertisement -
More from

Thinking Pink: How Southern Hoist Services Is Taking Social Value to New Heights

Southern Hoist Services says its pink hoist hire campaign has raised £10,000 for breast cancer causes, with a larger hoist set to join the fleet.

Scaffolding supplier Tube Monkeys goes into liquidation

Kent-based Tube Monkeys Scaffolding Supplies has entered voluntary liquidation, with company documents estimating a £142,000 shortfall for creditors.

Construction loses 2.1 million working days to injury and ill health

Illness accounts for four-fifths of construction’s lost working days, according to new HSE figures.

OSHA investigates contractor after New York scaffold collapse

OSHA has opened a probe into the New York scaffold collapse. Media reports on 15 November said the search for Diogo De Oliveira was continuing.
Latest articles