Scaffolding company fined after Bow St. collapse

ADVERTISEMENT

PORTSMOUTH — A Manchester scaffolding company committed four “serious” violations that led to the fall of a bricklayer at a Bow Street construction site, according to the Occupational Safety and Health Administration.

A settlement agreement between OSHA and Boston Ladder & Scaffolding Co. states the violations occurred Nov. 30 at the Martingale Wharf, a historic building currently under construction at 99 Bow St.

One OSHA violation states that each scaffold component was not capable of supporting, without failure, its own weight and at least four times the maximum intended load applied or transmitted to it. As a result of that finding, OSHA imposed a $2,450 fine.

Boston Ladder & Scaffolding also agreed to post notice of the OSHA finding and penalty near the accident site for a period of three days or until the violation is remedied.

OSHA also found the scaffolding company’s employees were not supervised by “a competent person qualified in scaffold erection, moving, dismantling or alteration.” For that “serious” violation, the company was fined $2,100.

A third violation with another $2,100 fine states the scaffolding company did not provide fall protection for employees.

The fourth violation states the Manchester company’s employees were not trained by a competent person and for that violation, it was fined an additional $2,100.

By terms of an agreement, the fines are due April 1 or they increase.

Emergency responders were called to the construction site the morning of Nov. 30 when a bricklayer fell through scaffolding to the ground, two stories below, where he was covered by fallen bricks and construction materials.

“Something gave way or fell,” Fire Capt. Bernie Marvin said at the time.

Marvin said the worker fell from one scaffolding, through a second one, then to the ground; a pan of mortar, scaffolding materials and a pile of bricks fell with and on top of him. The worker landed on a set of stairs with the bricks and boards, and it took responders about 15 minutes to free him from the debris.

“He was in a fair amount of pain,” Marvin said about the injured bricklayer, described as 37 years old and from Milford.

The worker was extricated, transported to Portsmouth Regional Hospital and released later the same day.

Developers Butch and John Ricci have been working on the building as a part of a two-year demolition and construction project which is expected to include 52,000 square feet of mixed-use space on six floors overlooking the Piscataqua River.

The Riccis are working with contractor Mark McNabb, who previously told the Herald the worker suffered no permanent injuries and broke no bones.

According to OSHA’s Web site, “falls are the most frequent cause of fatalities at construction sites and annually account for one of every three construction-related deaths.”

OSHA cites 2007 data from the Bureau of Labor Statistics noting that 442 construction workers died that year as a result of falling on the job.

Via: Seacoastonline

SM Newsdesk
SM Newsdeskhttps://www.scaffmag.com
The staff at ScaffMag.com the leading scaffolding site for a digital generation.

Most popular ↑

Investigation after Chatham scaffolder dies in Plumstead fall

Steven Farr, 47, died after a fall while erecting scaffolding in Plumstead. HSE and the Metropolitan Police are investigating, KentOnline reports.

Worker dies and another missing after New York bridge scaffold collapse

Developing: One worker died and another remained missing after scaffolding collapsed at the Loop Parkway Bridge on Long Island.

Taylor Wimpey scaffolders’ pay dispute moves to strike ballot

Unite says voting in the Sunderland pay dispute opened on 9 November and closes on 23 November. The dispute involves 19 scaffolders and 31 joiners.

NASC ends muddle over ‘basic’ scaffolding definition

The trade body for scaffolding contractors has launched an...

Taylor Wimpey opens redundancy talks over local team changes

Taylor Wimpey is consulting staff over local team changes that could lead to redundancies. The number of roles affected has not been disclosed.

Latest news

Brazil’s ABRASFE joins international scaffolding body

Brazil’s formwork, shoring and access association joins IASA, opening links for technical knowledge, training and safety standards.
- Advertisement -
More from

ScaffSense targets 2027 launch after Nordic Access buyout

ScaffSense is testing its scaffold stability alarm in two external pilots as Nordic Access Group takes the Swedish business towards a planned 2027 launch.

Brazil’s ABRASFE joins international scaffolding body

Brazil’s formwork, shoring and access association joins IASA, opening links for technical knowledge, training and safety standards.

NASC signs Nepal scaffolding skills agreement

NASC and Nepal’s Scaffolders Association have agreed to work together on training, competence and safety, with instructor development and equipment testing among the areas covered.

BSR chair warns of specialist scaffolder shortages in cladding work

Lord Roe tells MPs cladding enforcement must reflect specialist scaffolding capacity, warning against pressure to use unsuitable contractors.
Latest articles