London Bridge closed after fire breaks out on scaffolding

ADVERTISEMENT

image1

Scaffolding around a 12-storey office building near London Bridge that was awaiting demolition has caught fire.

The blaze at 33 King William Street, overlooking London Bridge, was on the scaffolding on the tenth floor of the building, London Fire Brigade have confirmed.

The Brigade were called at 6.06pm to the blaze. An London Ambulance Service Hazardous Area Response Team attended the scene but were stood down at 7.30pm with no casualties.

Debris was falling to the pavement below, and the road was closed off to traffic and pedestrians.

Here is an image posted on twitter of the scaffolding before the incident posted by QFS Scaffolding Ltd

SM Newsdesk
SM Newsdeskhttps://www.scaffmag.com
The staff at ScaffMag.com the leading scaffolding site for a digital generation.

Most popular ↑

Contractor injured in fall during Port Kembla scaffold erection

ABC reports that a contractor was injured in a fall during scaffold erection at BlueScope’s Port Kembla steelworks on 29 October. SafeWork NSW inspectors visited the site.

Ibstock issues profit warning as brick demand weakens

Ibstock has reportedly cut production and lowered its earnings expectations after third-quarter brick sales fell short of forecasts.

Scaffolding firms face tighter harassment duties from 30 October

Stronger harassment duties and new union-access rules take effect across Great Britain on 30 October, with implications for firms working on client-controlled sites.

Shield tackles hilltop access challenge in 19-day scaffold build

Shield erected access around the 38-metre Lansdowne Monument in 19 days despite a steep, rutted route that kept vans and lorries away from the hilltop.

Scaffold Innovations: GapClamp™

  Since the Work at Height Regulations 2005 came into...

Latest news

First Scaff wins NSW Employer of Choice award

The twelve-person scaffolding firm in Albury, New South Wales, Australia, has won a state workplace award and is calling for more training and higher standards across the industry.
- Advertisement -
More from

Self-employment reforms could shift proof burden onto contractors

Proposed worker-status changes could put the burden of proving genuine self-employment on contractors. A new assessment puts the economy-wide annual net direct cost at £167.8m.

Scaffolding firms face tighter harassment duties from 30 October

Stronger harassment duties and new union-access rules take effect across Great Britain on 30 October, with implications for firms working on client-controlled sites.

Budget 2026: what it means for scaffolding firms

Fuel duty relief, higher minimum wages and apprenticeship measures feature in Budget 2026, as NASC warns investment promises must translate into construction work.

Alimak targets £6m savings as construction profits fall

Alimak sets out SEK80m (about £6m) annual savings target as construction profits fall, while reporting positive UK parts and service demand.
Latest articles