Fall in Construction Enquiries, Warns FMB

ADVERTISEMENT

Small building companies in the UK are facing a significant downturn in workloads, enquiries, and employment, with 40% of members of the Federation of Master Builders (FMB) reporting a decrease in the number of work enquiries, according to the latest State of Trade Survey released by the FMB.

While the repair, maintenance, and improvement (RMI) sector remains relatively robust, there is growing concern within the industry about the declining state of housebuilding, which is struggling to keep pace with demand.

Brian Berry, Chief Executive of the FMB, expressed his concerns, stating, “The RMI sector remains fairly strong this quarter, with more FMB members still seeing an increase in workload than a decrease, but worrying signs are on the horizon with a sharp drop-off in enquiries.”

He continued, “House building continues to struggle with more members reporting fewer workloads than those reporting more. There has also been a sustained decline in enquiries, suggesting the picture will continue to worsen. Housing is rising up the political agenda as evidenced at the recent party conferences, and this new data highlights why the Government should be concerned at a time when we need to be building more, not fewer, new homes.”

The FMB’s latest survey for the third quarter of 2023 revealed several key findings:

Market Conditions:

  •  A decrease in total workload, enquiries, and employment, primarily driven by underperforming housebuilding and industrial and commercial sectors.
  •     40% of FMB members reported a decrease in enquiries.
  •     RMI reported workloads remain positive but have dropped since the second quarter of 2023.

Skills Shortage:

  •     Difficulty in recruitment has slightly increased.
  •     39% of members are struggling to hire carpenters, while 35% are facing challenges in hiring bricklayers.
  •     There has been a sharp upturn in difficulty hiring general labourers, with 34% reporting problems (up from 25% in Q2).
  •     Half of FMB members report that jobs are delayed because they are struggling to hire skilled workers.

Impact of Prices and Costs:

  •     71% of members report that material costs increased in Q3 2023, with 55% expecting this trend to continue into the next quarter.
  •     Increased outgoings have led to 71% of members increasing the prices they charge, with half reporting that their businesses are on track to make a loss or fall below expected margins.
  •     Over a quarter report that they are restricting hiring new staff as a consequence of increased outgoings.

The FMB State of Trade Survey, released quarterly, is the longest-running survey of its kind, tracking the experiences of small to medium-sized construction firms in the UK. With these concerning findings, industry experts and policymakers will be closely monitoring the construction sector and considering potential measures to support its recovery. 

SM Newsdesk
SM Newsdeskhttps://www.scaffmag.com
The staff at ScaffMag.com the leading scaffolding site for a digital generation.

Most popular ↑

Contractor injured in fall during Port Kembla scaffold erection

ABC reports that a contractor was injured in a fall during scaffold erection at BlueScope’s Port Kembla steelworks on 29 October. SafeWork NSW inspectors visited the site.

Ibstock issues profit warning as brick demand weakens

Ibstock has reportedly cut production and lowered its earnings expectations after third-quarter brick sales fell short of forecasts.

Four injured in Taiwan market scaffold collapse

Taipei has halted work at the old Beitou market demolition site after a scaffold collapse injured four people. Investigations are continuing.

NIE Networks tenders £4.8m scaffolding framework for power infrastructure

NIE Networks is seeking scaffolding services across Northern Ireland's electricity infrastructure through two lots, with an initial four-year term and extension options.

PHD Access joins £190m Dungeness A decommissioning team

Aureos has named PHD Access as its scaffolding partner for the removal of eight 800-tonne boilers at Dungeness A. The overall programme is worth up to £190m.

Latest news

Salary disclosure planned for job adverts as employers await details

Ministers plan to require salary information in job adverts, with scaffolding employers awaiting details on scope, enforcement and when the rules will begin.
- Advertisement -
More from

Salary disclosure planned for job adverts as employers await details

Ministers plan to require salary information in job adverts, with scaffolding employers awaiting details on scope, enforcement and when the rules will begin.

Mobile scaffold falls three decks on offshore support vessel

Marine Safety Forum reports a three-tier scaffold collapse during repositioning, with seized wheels and no exclusion zone on the deck below.

Vistry begins job cuts ahead of January regional shake-up

The housebuilder is reducing its operating regions from 25 to 12 and matching build rates to demand as private housing conditions remain difficult.

Housing weakness deepens as RICS flags tougher credit outlook

RICS reports weaker housing workloads, while infrastructure remains the strongest construction market.
Latest articles