GEDA hoist supports restoration of historic Belgian church tower

ADVERTISEMENT

Work is underway to restore the imposing tower of St Martin’s Church in Arlon, Belgium, with German manufacturer GEDA providing specialist lifting equipment to support the project.

The neo-Gothic church, built between 1907 and 1914, is considered one of the most important examples of its architectural style in Wallonia. As part of the restoration, sections of the tower will be carefully dismantled, with original stones refurbished and reused in line with strict conservation rules.

To meet the complex demands of the site, GEDA has supplied a 1500 Z/ZP transport platform with a lifting height of 100 metres, alongside six floor safety doors, through its Belgian partner Intermat.

The platform, which can carry up to 2,000kg or seven people, is being used both to erect scaffolding and to move materials and personnel during the renovation.

Because the listed tower could not be drilled or altered to accommodate fixings, the lift was anchored solely to the scaffolding. This was achieved using GEDA’s two-mast system and UNI-X mast, which allows large anchoring distances of up to 12 metres with minimal force.

The contractor, Galère Srl, will operate the platform for the duration of the 50-month project. Scaffolding works are being managed by Alphascaff, which is also employing additional GEDA hoists on site.

GEDA, based in Asbach-Bäumenheim, Germany, has been supplying lifting and transport solutions for more than 90 years, with products used on construction and industrial sites worldwide.

SM Newsdesk
SM Newsdeskhttps://www.scaffmag.com
The staff at ScaffMag.com the leading scaffolding site for a digital generation.

Most popular ↑

SAIA names teams for 2027 Scaffold Builders Competition

Manchester-based AK Scaffolding is on the list for Las Vegas, alongside 4 first-time entrants from the US, Lithuania, Switzerland and Canada.

Mobile scaffold falls three decks on offshore support vessel

Marine Safety Forum reports a three-tier scaffold collapse during repositioning, with seized wheels and no exclusion zone on the deck below.

Scaffold firm fined £16,000 after trainee’s fatal fall

HSE found that safe zones had not been established when Michael Swales fell 5 metres from a partially erected scaffold near Ripon.

Four injured in Taiwan market scaffold collapse

Taipei has halted work at the old Beitou market demolition site after a scaffold collapse injured four people. Investigations are continuing.

Vistry begins job cuts ahead of January regional shake-up

The housebuilder is reducing its operating regions from 25 to 12 and matching build rates to demand as private housing conditions remain difficult.

Latest news

NZ to end public scaffold certificate register in WorkSafe handover

Employers face direct certificate checks as WorkSafe takes over New Zealand’s scaffolding CoC scheme. Existing cards will remain valid until expiry.
- Advertisement -
More from

SAIA names teams for 2027 Scaffold Builders Competition

Manchester-based AK Scaffolding is on the list for Las Vegas, alongside 4 first-time entrants from the US, Lithuania, Switzerland and Canada.

Doka details climbing systems for Burj Binghatti tower

Doka’s project update sets out the climbing and edge-protection systems being used on Burj Binghatti, with a target of 1 floor a week.

Worker seriously injured in Swiss scaffold dismantling fall

A 37-year-old worker was seriously injured while dismantling scaffolding in Oberstammheim, Switzerland. Police are investigating the cause of the fall.

First Scaff wins NSW Employer of Choice award

The twelve-person scaffolding firm in Albury, New South Wales, Australia, has won a state workplace award and is calling for more training and higher standards across the industry.
Latest articles