German Engineering Aids Landmark Bridge Renovation in Slovenia

ADVERTISEMENT

Two major highway bridges near Maribor, Slovenia, are undergoing extensive renovation, with cutting-edge German technology playing a vital role in the project’s success.

The Skedenj-I and Skedenj-II bridges, stretching a combined 930 metres, are being refurbished with the support of elevator systems provided by Bavarian manufacturer GEDA GmbH.

The works, expected to take around six months, represent one of Slovenia’s largest infrastructure renovation projects. Skedenj-I spans 530 metres and rises up to 30 metres, while Skedenj-II is 400 metres long with a height of 50 metres. Both bridges are using a combination of full pylon scaffolding and suspended scaffolds beneath the deck.

To meet the logistical challenges, GEDA has supplied two elevator systems to support material transport and worker mobility. The GEDA 300 Z handles heavy lifting, capable of moving materials up to 300 kilograms at speeds of 30 metres per minute, with a lifting range of up to 100 metres.

Alongside it, the GEDA 500 Z/ZP offers flexible transport for both people and materials. In passenger mode, it carries up to five individuals, while in material mode, it can lift loads up to 500 kilograms. Its safety features include GEDA’s own landing level gates, designed specifically for scaffold-based worksites.

Jernej Gornjak, Technical Director at HEGOMONT d.o.o., the Slovenian construction partner on the project, praised the collaboration:

“This is the largest renovation of viaducts—highway bridges—in the history of Slovenia. We could never have successfully completed such a massive project under such demanding conditions without the help of GEDA elevators.”

He added that the use of the hoists has allowed them to build hanging scaffolds at an impressive pace of over 12 metres per day across the entire underside of the bridge.

The project is also a milestone for HEGOMONT, marking the largest in the company’s history both in terms of complexity and financial scale. Their long-standing partnership with GEDA, now spanning over 25 years, has proven vital.

Founded in Germany over 90 years ago, GEDA is known for its reliable construction and industrial elevator systems, now in use across more than 80 countries.

SM Newsdesk
SM Newsdeskhttps://www.scaffmag.com
The staff at ScaffMag.com the leading scaffolding site for a digital generation.

Most popular ↑

CISRS says CSCS notice was served to negotiate “from a stronger position”

NASC president Sarah Klieve says CISRS served CSCS notice to negotiate from a stronger position, as Build UK says the card rules don’t block other sectors.

Blencowe report details £620,000 asset sale and creditor shortfall

Newly filed administrators’ proposals detail the August equipment sale to Aiseandan Plant and forecast no dividend for Blencowe’s unsecured creditors.

Orwell awards scaffolding contracts valued at £330,000

Orwell Housing Association has appointed Apex Scaffolding Anglia and S P Scaffolding (East Anglia) for repair and maintenance work under two contracts valued at £165,000 each excluding VAT.

Unsecured scaffolding loads flagged in Operation Rule checks

Police identified unsecured scaffolding among the problems found during September’s national commercial vehicle checks.

Scaffold Innovations: GapClamp™

  Since the Work at Height Regulations 2005 came into...

Latest news

MoJ awards £56,000 prison scaffolding training contract

Platinum Rail Services will deliver courses at Holme House and Low Newton, with links to employers offering paid vacancies.
- Advertisement -
More from

AFIX Group steps up expansion across Asia, Middle East and Africa

Scaffolding manufacturer AFIX Group is expanding its presence across Asia, the Middle East and Africa as it looks to strengthen its distribution network and secure larger industrial and infrastructure projects.

Worker dies in fall as campaigners count 21 Hong Kong construction deaths this year

A 34-year-old worker has died in a fall at a Tung Chung public housing site, the 21st construction death in Hong Kong this year according to a victims' rights group.

86m Layher scaffold completed at Giotto’s Bell Tower

An 86-metre scaffold erected in just over four months will support a five-year restoration of the Florence landmark while keeping it open to visitors.

HAKI Safety appoints Tomas Hilmarsson as CEO

HAKI Safety has appointed CFO Tomas Hilmarsson as CEO and president from 1 November, succeeding Sverker Lindberg.
Latest articles