Shield tackles hilltop access challenge in 19-day scaffold build

Shield designed and installed access for conservation of the 38-metre Lansdowne Monument, overcoming a steep, rutted approach to the exposed Wiltshire site.

ADVERTISEMENT

Shield Scaffolding Services erected access around Wiltshire’s 38-metre Lansdowne Monument in 19 days despite a steep, rutted approach that prevented vans and lorries from reaching the hilltop site.

The scaffolding division of Shield Services Group designed and installed the structure for Cliveden Conservation to support restoration of the Grade II* listed obelisk at Cherhill.

Even four-wheel-drive access depended on ground conditions, according to Shield.

The contractor worked with the project team and a local farmer to move materials up to the exposed site.

Jamie Angell, Shield’s scaffolding managing director, said:

“This was a project where the planning and preparation were just as important as the installation itself. The location meant we had to think carefully about how we would get the materials to the monument and keep everything moving efficiently once we were on site.”

Shield said the monument’s prominent position in the downland landscape also called for a sensitive approach to erecting the scaffold.

Angell added: “The team worked extremely well together, adapting to the access conditions and working closely with Cliveden to overcome the logistical challenges.”

The completed structure provides working access for Cliveden and its specialist conservation teams.

The 19-day programme covered scaffold installation. Conservation work was still ongoing when Shield’s representatives supplied a project update to Scaffmag on 20 October.

Historic England’s listing dates the obelisk to 1845, when it was erected to Sir Charles Barry’s design for the third Marquess of Lansdowne.

It commemorates Sir William Petty, the statistician and economist who was an ancestor of the Petty-Fitzmaurice family.

The rubble-stone monument, with ashlar dressings, stands on Cherhill Down alongside the chalk White Horse and Oldbury Castle’s Iron Age earthworks, as described by the National Trust.

Daniel Norton
Daniel NortonFounder & Editorhttps://www.scaffmag.com
Daniel Norton is the founder and editor of Scaffmag and Editor-in-Chief of Scaffold & Access Magazine. A former scaffolder, he founded Scaffmag in 2008 and now leads its news and editorial coverage of the global scaffolding and access industry, including safety, regulation, business, innovation and major industry events.

Most popular ↑

Investigation after Chatham scaffolder dies in Plumstead fall

Steven Farr, 47, died after a fall while erecting scaffolding in Plumstead. HSE and the Metropolitan Police are investigating, KentOnline reports.

Worker dies and another missing after New York bridge scaffold collapse

Developing: One worker died and another remained missing after scaffolding collapsed at the Loop Parkway Bridge on Long Island.

NASC ends muddle over ‘basic’ scaffolding definition

The trade body for scaffolding contractors has launched an...

Taylor Wimpey scaffolders’ pay dispute moves to strike ballot

Unite says voting in the Sunderland pay dispute opened on 9 November and closes on 23 November. The dispute involves 19 scaffolders and 31 joiners.

Construction output falls 0.7% in third quarter

Construction output fell 0.7% between July and September, while the wider UK economy grew by the same margin.

Latest news

NASC backs youth hiring proposals but warns costs still too high

NASC welcomes proposed apprenticeship grants and youth hiring requirements on public projects, while warning that employment costs remain a barrier.
- Advertisement -
More from

NASC backs youth hiring proposals but warns costs still too high

NASC welcomes proposed apprenticeship grants and youth hiring requirements on public projects, while warning that employment costs remain a barrier.

2020 Scaffolding takes Earlswood site for expansion

Redditch contractor takes additional storage space as it plans to grow its ten-strong workforce.

Taziker selected for Nottingham heat station scaffolding contract

Taziker has been selected to provide site-based scaffolding for operations and maintenance at Nottingham’s London Road Heat Station. The contract remains pending signature.

BSR chair warns of specialist scaffolder shortages in cladding work

Lord Roe tells MPs cladding enforcement must reflect specialist scaffolding capacity, warning against pressure to use unsuitable contractors.
Latest articles