Harsco’s Integrated Access Solution Helps Construction Of New Waste-To-Energy Plant

ADVERTISEMENT

Harsco

A variety of access, formwork and shoring systems from Harsco Infrastructure (formerly SGB) were used to construct a new £205 million state-of-the-art Energy from Waste plant in Ardley, North Oxfordshire.

Harsco designed and supplied the formwork required for the creation of 24m deep reinforced waste bunker which will accommodate up to 5,000 tonnes of waste. The bunker is being constructed using a combination of Harsco’s LOGIK®60 wall formwork panel system, MULTIFORM climbing brackets to create access platforms, and lightweight GASS® aluminium shoring. The GASS® system is being used to provide safe working access for the creation of the numerous intermediate concrete floor slabs that will be included inside the waste bunker.

Other products and services supplied include EXTRAGUARD™ edge protection system, to ensure maximum site safety, plus DU-AL™ and Mk II Soldier aluminium beams to create a variety of structures for wall and soffit support. These were complemented by Harsco’s CUPLOK® which was used to create temporary staircases up to 24m in height.

“As on previous projects where we have worked with Harsco, their expertise and great range of products and systems have come together to create an excellent solution to our needs. We have a sole supplier agreement with Harsco for formwork and falsework requirements and have recently been working with them on other waste-related projects in Lincoln, Shropshire and Stafford,” says John Holmes, Senior Works Manager, Clugston Construction Ltd.

When complete in 2014 the plant will be able to process 300,000 tonnes of non-recyclable waste per year – sufficient to divert at least 95% of Oxfordshire’s residual municipal waste away from landfill disposal. It will also be able to generate up to 24 MW of electricity – enough to power some 38,000 homes.

 

SM Newsdesk
SM Newsdeskhttps://www.scaffmag.com
The staff at ScaffMag.com the leading scaffolding site for a digital generation.

Most popular ↑

Government announces paternity pay for self-employed dads

Self-employed fathers and partners are to receive two weeks of support under government plans, with payments currently worth up to £194 a week.

Two taken to hospital after Streatham scaffolding collapse

Two people were rescued before firefighters arrived after scaffolding collapsed on Streatham High Road on 25 October. Both were taken to hospital.

Luton plans £11m scaffolding framework

Luton Council is preparing an estimated £11.04m scaffolding framework and will hold a supplier briefing next week ahead of a planned December tender.

Budget 2026: what it means for scaffolding firms

Fuel duty relief, higher minimum wages and apprenticeship measures feature in Budget 2026, as NASC warns investment promises must translate into construction work.

Forty CVs, and one of them is talking to ChatGPT.

Brian Webb examines how hidden instructions in CVs and other documents can influence AI responses, and what scaffold businesses should watch for.

Latest news

PHD Access joins £190m Dungeness A decommissioning team

Aureos has named PHD Access as its scaffolding partner for the removal of eight 800-tonne boilers at Dungeness A. The overall programme is worth up to £190m.
- Advertisement -
More from

PHD Access joins £190m Dungeness A decommissioning team

Aureos has named PHD Access as its scaffolding partner for the removal of eight 800-tonne boilers at Dungeness A. The overall programme is worth up to £190m.

Shield tackles hilltop access challenge in 19-day scaffold build

Shield erected access around the 38-metre Lansdowne Monument in 19 days despite a steep, rutted route that kept vans and lorries away from the hilltop.

Tyne Bridge to close for overhead scaffold deck installation

Advanced scaffolders will work around the clock during an October half-term closure to install a protection deck ahead of main arch restoration in early 2027.

86m Layher scaffold completed at Giotto’s Bell Tower

An 86-metre scaffold erected in just over four months will support a five-year restoration of the Florence landmark while keeping it open to visitors.
Latest articles