Take the Altrad Futuro Challenge to see how much you could save

Promotional Content

ADVERTISEMENT

Generation UK demonstrate once again why they believe the future of scaffolding lies in the system scaffold Futuro, with their brand new system scaffold calculator; The Futuro Challenge.

The Futuro Challenge estimates how much time, money and effort you could save by using the ultimate Altrad Futuro; compared to tube and fitting and other modular system scaffolds. The challenge works by calculating how much money you could save on labour costs*, due to the quicker erection time.

Generation are asking you to consider a scaffolding scenario and demonstrate how many scaffolders you would use and how much time it would take to replicate the Generation scenario.

In the ever-changing world of scaffold, Futuro is fundamental to the future of scaffolding; 50% quicker to erect than Lok systems and 300% faster than tube fittings and boards.

Not only does Futuro offer the benefits of saving time, effort and money, it is also an imperial system. Generation pride themselves on offering the best quality at the best prices on hire or sale basis.

Take the Futuro Challenge and speak to our experts today to see how much you can save with Futuro!

*Based on the 2017 average scaffolder wage

SM Newsdesk
SM Newsdeskhttps://www.scaffmag.com
The staff at ScaffMag.com the leading scaffolding site for a digital generation.

Most popular ↑

CISRS says CSCS notice was served to negotiate “from a stronger position”

NASC president Sarah Klieve says CISRS served CSCS notice to negotiate from a stronger position, as Build UK says the card rules don’t block other sectors.

Scaffold collapses at Sydney site weeks after two workers seriously injured

The scaffold came down at a development on Wattle...

Scaffold Innovations: GapClamp™

  Since the Work at Height Regulations 2005 came into...

Adrian Chiles puts scaffolding skills shortage in national spotlight

A Guardian column has brought wider attention to recruitment pressures already affecting scaffolding contractors.

SG4:10 We Think The Answer Is Fast Guard™

If Carlsberg made advance guardrails.....  could this be the...

Latest news

HAKI Safety appoints Tomas Hilmarsson as CEO

HAKI Safety has appointed CFO Tomas Hilmarsson as CEO and president from 1 November, succeeding Sverker Lindberg.
- Advertisement -
More from

AT-PAC details Raised Ledger System after Product of the Year win

AT-PAC has released further details of its Raised Ledger System after the product was named Product of the Year at the 2026 Scaffolding Excellence Awards.

ITP launches flame-retardant shrink wrap for scaffold containment

Powerclad FR Tite is designed for temporary containment and weather protection, with ITP citing EN ISO 11925 testing and Warringtonfire TS 62 certification.

Scafom-rux to launch new VECTA roof and beam system at ScaffEx26

Scafom-rux will use ScaffEx26 in Manchester to launch VECTA, a new aluminium temporary roof and beam system designed around shared components and larger clear spans.

ScaffCycle relaunches used scaffolding marketplace

ScaffCycle has relaunched its online marketplace for used scaffolding after rebuilding the platform to make it easier for contractors,...
Latest articles