Ad
Friday, November 7, 2025

Scaff Step Survey [Results]

ADVERTISEMENT

Back in May we reported that the SCCR (Scaffolders Confederation for Consultation Rights) conducted a survey for the Scaff Step. Below are the results to this survey that was posted on the SCCR website.

The Survey was a breakdown of replies from members of the SCCR, Scaffolder forum and readers of ScaffMag. Compiled from around 110 replies of which 15% were management.

The Survey

1. Does your employer or their customers insist on the scaff step being the only method used on their sites?

43.3% Use the step

33.3% Don’t work to SG4:10

23.3% Work in offshore or industrial using other more suitable methods for their environment.

 

The answers below are only from scaffolders that use the step on a daily basis.

The ones that use the step

54% said yes

46% said no

 

2. What other methods of advanced guard rails do you or your company use and what is your opinion on them?

53.3% said no other A.G.R. used

13.3% use a dummy lift but time and cost is an issue.

13.3% use a sliding tube.

6.7% use Fast Guard

6.7% use Haki Wand

6.7% use double lanyard and Wrappa Anchor

 

3. If you use a scaff step what type is it, does it sit on the guard rail or on the standard, does it have a ladder to the platform or not?

All have steps going to the platform

93% sit on the guardrail

7% attach to the standard

 

4. If you use a scaff step do you feel safe using it, do you hemp while standing on the step?

71.4% feel unsafe using the step

28.6% do not feel unsafe using the step

 Also

64.3% hemp from the step

35.7% refuse to hemp from the step

 

5. Do you think that the scaff step causes extra strain and fatigue to the body?

71.5% say yes

28.5% say no

One is more concerned about gin wheels

 

6. Are you happy with hemping over the guard rail, do you consider this dangerous.

71.4% are unhappy with hemping over guardrails

28.6% are not

Also

85.8% consider it dangerous

14.2% do not

 

7. Do you use the scaff step on base lifts, if so how do you manage with uneven ground conditions?

50% use the step on base lifts and erect a foot lift if necessary

50% do not use it on base lifts

 

8. How are the scaff steps transported from site to site?

71.4% are transported by company vehicles

21.4% are transported in scaffolders own cars

7.2% are left on site

 

9. Do you consider them dangerous in wet or muddy conditions?

92.9% said yes

7.1% said no

 

10. Have you or have you witnessed an accident or near miss due to the use of the scaff step or hemping over the guard rail?

78.6% said they had ranging from trips because of the step cluttering lifts to broken bones losing footing on the step and dropped hemps which could have caused a fatality.

21.4% said no but 50% of them expect to see one soon.

 

11. Do you feel that your job is at risk if you complain about using something you consider unsafe or puts extra strain on your body?

71% said yes

29% said no

 

12. Do you think the SG4:05 traversing rule was adequate?

78.4% said yes although many admit it was flawed and easily abused

21.6% said no

 

What do you think of the Scaff Step ? Let us know in the comments.

ADVERTISEMENT

Popular Categories

Latest news

ULMA Construction eyes UK expansion with Des Moore leading setup

European scaffolding and formwork giant ULMA Construction is preparing to enter the UK market, with industry leader Des Moore steering the launch phase. The Spanish-based...

PERI UK’s Terry Hall recognised as ‘Unsung Hero’ for driving formwork safety reform

Terry Hall, Field Services Manager at PERI UK, has been honoured with the ‘Unsung Hero’ award at this year’s CONSTRUCT Day for his work...

Scaffolders urged to tighten safety as climate change brings fiercer storms

Extreme weather is exposing poor practices across the scaffolding industry, as insurance specialists urge contractors to tighten safety procedures in response to increasingly severe...

Connolly Scaffolding unveils major new Salford base as part of multi-million-pound expansion

Connolly Scaffolding has completed a major expansion with the opening of a new 26,000 sq ft warehouse and yard in Salford – a move...

Surge in construction apprenticeships as CITB support drives 61% rise

The Construction Industry Training Board (CITB) has reported a sharp rise in apprenticeship starts, with more than 1,500 new apprentices supported by its New...

URTIM powers Turkey’s first floating gas platform

Turkey has taken a major step towards energy independence with the completion of its first floating natural gas production platform, the Osman Gazi. At the...

CISRS announces suite of new safety and inspection courses

The Construction Industry Scaffolders Record Scheme (CISRS) has announced a series of new and updated training courses aimed at improving safety, technical standards, and...

House-building recovery delayed until 2029, industry warns

The Construction Products Association warns UK house-building will not recover to pre-pandemic levels until 2029 or 2030, urging government support for first-time buyers to prevent further insolvencies and job losses.

Staht secures largest ever distribution deal with Leach’s

One of the UK’s leading testing technology firms, Staht, has announced its largest ever distribution agreement after joining forces with Leach’s. The partnership will expand...

Avontus to host free webinars on digital scaffold management this November

Avontus Software has announced a series of free, live webinars in November designed to help contractors overcome the everyday challenges of tracking and managing...

Latest news

ADVERTISEMENT

The magazine

Issue 27 | Past issues >>

Popular

CISRS announces suite of new safety and inspection courses

The Construction Industry Scaffolders Record Scheme (CISRS) has announced...

URTIM powers Turkey’s first floating gas platform

Turkey has taken a major step towards energy independence...

Connolly Scaffolding unveils major new Salford base as part of multi-million-pound expansion

Connolly Scaffolding has completed a major expansion with the...

House-building recovery delayed until 2029, industry warns

The Construction Products Association warns UK house-building will not recover to pre-pandemic levels until 2029 or 2030, urging government support for first-time buyers to prevent further insolvencies and job losses.

Scaffolders urged to tighten safety as climate change brings fiercer storms

Extreme weather is exposing poor practices across the scaffolding...

Related articles

Demolition firm issues statement following Manchester building and scaffolding collapse

Manchester-based demolition contractor P.P. O’Connor has released an official statement following Friday’s partial collapse of a building surrounded by scaffolding in the city centre. The incident occurred at Alberton House, on St Mary’s Parsonage...
ADVERTISEMENTS

Latest topics

Kirtanlal and Al Masaood partnership set to reshape the Middle East scaffolding sector

Kirtanlal Scaffolding & Formwork has announced a new strategic...

ULMA Construction eyes UK expansion with Des Moore leading setup

European scaffolding and formwork giant ULMA Construction is preparing...

Scaffolders urged to tighten safety as climate change brings fiercer storms

Extreme weather is exposing poor practices across the scaffolding...
ADVERTISEMENTS