Peri will showcase their state of the art products at the MEC 2011 during November 21 – 24 at the Dubai International Exhibition Centre in the Saeed Halls.
Professionals will be treated to a wealth of information at the Peri stall including intensive discussions with Peri team of experts, tours of the exhibited products, latest documentation and live product demonstrations which will highlight the advantages of the Peri products.
On an area of around 72 m² Peri will be presenting proven system equipment, solid product enhancements and numerous new developments. As one of the leading formwork and scaffolding suppliers in the Middle East with offices throughout the entire MENA region, Peri will not only exhibit already wellknown and established products, but also launch a new product targeted at the high demand within oil and petrochemical projects.
Presentation of proven and innovative systems
Among the products showcased at the Peri stand are proven formwork systems as well as the flexible Peri UP Rosett Flex modular scaffolding system.
With interactive live demonstration and product experts from Germany, Peri will demonstrate how easy it is to erect Peri SKYDECK, the light-weight aluminium panel slab formwork for faster assembly. Equipped with a drophead, early striking is possible after only one day (depending on the slab thickness and concrete strength). On-site material requirements can be reduced as the beams and panels are then available for the next concreting cycle.
SKYDECK is made of aluminium; no component weighs more than 15 kg. Thanks to the low weight of the individual components, SKYDECK enables easy and tireless erection and striking. The SKYDECK main beam reduces the number of props needed – only 0.29 props per square metre of slab are required. This saves time and offers more workspace which simplifies the transportation of formwork materials across the site.




The sackings came after one of the scaffolders Tony Seaman who is an activist for UNITE union took a letter of grievance to management on Wednesday asking to talk about increasing pay.
The scaffolders claimed he was then asked to leave the site along with 13 other scaffolders.
The industrial action was immediately set up outside the site which swelled to over 100, involving other trades such as fitters and electricians that walked out in sympathy for the scaffolders, calling for the men to be reinstated.
Officials from UNITE and GMB unions held talks with the company to get the men back to work. However, no deal could be met.
Scaffolder, Tony Seaman said: “I think it is wrong and we are very angry about this. “All we wanted was a review into our pay. We are on £10.46 an hour and under the blue book agreement we wanted £14. What is wrong with that?”
It’s understood that union officials and the company agreed on Friday to take the matter to the conciliation service ACAS, but a condition was that the picket line should be removed.
However workers refused to call off the action until they were given their jobs back and on Friday the matter was deadlocked.
UNITE official Bill Green said: “The unions have told the men that they are on their own because the walk-out is illegal. The company claimed they never received a grievance letter. This is an unfortunate and regrettable matter that needs to be sorted out.”
Communications Director David Massey at Hertel UK said: “Due to changes in the scope of the work we are carrying out at Lucite, the company was in a position where it needed to end a number of temporary contracts.”
“This has involved 14 men, all of whom were employed as temporary scaffolders and labourers. The process was managed in accordance with standard procedures with appropriate notice issued to each of the affected employees.”
Talks are expected to continue soon.
Steve started his UTN Training company 15 years ago when he built a 50 metre road to Highway specifications in order to train road workers the way to excavate and re-instate correctly. He has since seen 10,000 road workers successfully complete the New Roads and Street Works course.
With the massive rise in the popularity of solar panels, particularly with the Yorkshire Region, Steve was getting many enquiries about training for installers and decided to build the biggest, at height, all weather training roof in the country at his Wakefield base.
Steve has now formed a collaborative partnership with Barnsley College to deliver Environmental and Sustainable Training and Education throughout the region.
“There are other companies offering similar training but usually at ground level. I decided that if people were going to have to work at height they should be trained at height”, said Steve.
His company already has an approved scaffold training centre and is accredited to run many other health and safety and management courses.
“Solar energy is a booming market and many local authorities are turning to solar power for their housing stock but there is a lack of trained people to do the installation,” said Steve. “In this area alone councils are proposing to spend in excess of £400 million installing solar power.”
”Our five day course is designed to give inexperienced and unemployed building workers the basic skills to fit solar panels on roofs under supervision which would be ideal for many people seeking work at the moment,” he added. In addition there are shorter courses for qualified electricians, plumbers and roofers, who already have many of the skills required for the job.
Recently the Health and Safety Executive announced they would be focusing their attention this year on smaller companies and targeting those installing solar capture equipment to ensure they are complying with health and safety law.
View