Under Deck 2000 fitting

ADVERTISEMENT

Under Deck 2000

This old fitting is called the Under Deck 2000 it was developed by a offshore scaffolder called Ricky Morgan many years ago.

The fitting was designed to make building hangers with ease under platforms. You were able to build your goal posts and slide them out along the beam eliminating the use of buts and beam clamps. The fitting also doubled as your check fitting for your dropper.

The Under Deck 2000  has now been deemed obsolete due to when you tighten one bolt on the gate side the other bolt loosens due to the compression on the fitting (similar to what happens with a pressed sleeve) the same effect happens on the clamp side. some of the old school scaffs swear by them! every day is a school day!!!

As a side note: The Under Deck 2000 never really took off because of early mistakes Ricky Morgan made with the marketing of the fitting. The rumours are Ricky went straight to the top Oil & Gas bosses and tried to cut out the Scaffolding Service Companies. This in-turn pissed off the Service Companies and they gave the Under Deck 2000 bad press. Then to make matters worse the Oil & Gas bosses gave the fitting a big back heel.

By Lloyd McKenzie

Have you ever come across the Under Deck 2000 fitting ? Let us know in the comments below.

Most popular ↑

Australia steps up push for scaffolding to gain skilled-trade status

Scaffolding Association Australia has taken its campaign for formal trade recognition and a structured apprenticeship pathway to federal decision-makers in Canberra.

£4.5m scaffolding framework opens for contractors in North East and Yorkshire

Beyond Housing has opened bidding for a £4.5m scaffolding framework covering planned and reactive works across Redcar and Cleveland and parts of North Yorkshire.

London developer fined after required roof scaffold was never provided

A London developer and its director have been fined after unsafe roof work continued despite a subcontractor’s risk assessment identifying scaffolding as a required control.

Bamboo scaffolder recounts dismantling fire-damaged Wang Fuk Court

Hong Kong scaffolder Yip Hon-ying has described how a 30-strong team spent 3 months removing fire-damaged bamboo scaffold from 7 blocks at Wang Fuk Court.

SMART Scaffolder to unveil AI-powered voice reporting at ScaffEx26

SMART Scaffolder will use ScaffEx26 to introduce a new AI-powered reporting system that allows scaffolders to complete digital forms using natural speech.

Latest news

Acrow set to complete AGIS acquisition as industrial access expansion accelerates

Australian scaffolding and construction services group Acrow is preparing to complete its acquisition of AusGroup Industrial Services as it pushes deeper into industrial access across Queensland’s resources and infrastructure markets.
- Advertisement -
More from

TG30 Update Drives Surge in Scaffold Compliance Downloads

The National Access and Scaffolding Confederation (NASC) has seen a sharp rise in downloads of its scaffold compliance guidance,...

BSI Revises Temporary Works Standards for Safer Construction

Updated safety standards for temporary works in construction have been published by the British Standards Institution (BSI), providing clearer...

TG30 Set to Transform System Scaffolding Safety and Compliance at ScaffEx24

The National Access and Scaffolding Confederation (NASC) is set to introduce a significant advancement in scaffolding safety and compliance...

NASC Outlines New Fire Risk Measures in Wake of Grenfell Inquiry

Following the final report from the Grenfell Tower Inquiry and a recent fire at a residential block in Dagenham,...
Latest articles