Powerclad Sheeting Prevails Over Hostile Offshore Conditions

ADVERTISEMENT

ipt Powerclad Flame Retardant Filter Sheeting from Industrial Textiles and Plastics (ITP) has been successful in withstanding the rigours of the exposed conditions in the North Sea to facilitate the refurbishment of an oil rig derrick. Maintenance and inspection work on offshore oil rigs is undoubtedly complicated and dangerous, a problem magnified on those located in the North Sea.  Recent repair work to the derrick on the Bideford Dolphin, situated off the coast of Norway was a particular challenge due to the extreme wind speeds.  The two-fold effect of these conditions is an accelerated corrosion of the rig structure, and a difficulty in repair and refurbishment works. Built in 1975, the Bideford Dolphin forms part of the Dolphin drilling fleet that consist of 2 deep water units, 5 semi-submersible drilling rigs, as well as a support vessel and accommodation unit.  Dolphin Drilling is one of the longest established independent drilling contracting firms in the offshore arena tracing its roots back to the earliest offshore exploration activity in the North Sea in the mid 1960’s. Specialising in innovative access solutions for fabric maintenance and inspection, Skanits AS was selected to undertake the repair work to the derrick on the Bideford Dolphin.  The containment system on the derrick was erected in 48 hours, and remained secure for the 19 days of the works, protecting the workforce and allowing drilling operations to continue. Alf Rune Falck, Director of Skanits AS said: “The Powerclad sheeting withstood the fierce conditions and provided excellent protection for the workforce and equipment.  The use of the safe work zone system enabled us to work at several levels at one time, saving us a total of 10 days.” Managing Director at ITP, Marc van der Voort said:

“Powerclad Filter Sheeting provides exceptional weather protection in exposed locations and harsh climates such as the North Sea.  It is a closed woven mesh for improved ventilation, as air permeability is desirable in many installations to contain debris and dust, disperse paint solvents and dry out interior works.   Our expertise is in Flame Retardant materials, which should always be used for works on occupied buildings or on safety critical installations such as shipyards and refineries.”

Working within a demanding framework of time, budget and safety limitations, the project was successfully delivered against all criteria with no disruption to the daily operations of the rig.

SM Newsdesk
SM Newsdeskhttps://www.scaffmag.com
The staff at ScaffMag.com the leading scaffolding site for a digital generation.

Most popular ↑

Government announces paternity pay for self-employed dads

Self-employed fathers and partners are to receive two weeks of support under government plans, with payments currently worth up to £194 a week.

Two taken to hospital after Streatham scaffolding collapse

Two people were rescued before firefighters arrived after scaffolding collapsed on Streatham High Road on 25 October. Both were taken to hospital.

Scaffold Innovations: GapClamp™

  Since the Work at Height Regulations 2005 came into...

CISRS says CSCS notice was served to negotiate “from a stronger position”

NASC president Sarah Klieve says CISRS served CSCS notice to negotiate from a stronger position, as Build UK says the card rules don’t block other sectors.

Luton plans £11m scaffolding framework

Luton Council is preparing an estimated £11.04m scaffolding framework and will hold a supplier briefing next week ahead of a planned December tender.

Latest news

Shield completes Lansdowne Monument scaffold in 19 days

Shield designed and installed access for conservation of the 38-metre Lansdowne Monument, overcoming a steep, rutted approach to the exposed Wiltshire site.
- Advertisement -
More from

Self-employment reforms: what the proposals mean for scaffolding firms

A new government assessment examines proposed worker-status changes. What could they mean for scaffolding firms using self-employed labour?

Employment Rights Act changes hit scaffolding employers

Stronger harassment duties and a new union-access framework take effect on 30 October. Here is what scaffolding employers need to know.

Alimak targets £6m savings as construction profits fall

Alimak sets out SEK80m (about £6m) annual savings target as construction profits fall, while reporting positive UK parts and service demand.

PHD Access announces €37.7m investment for European expansion

PHD Access has announced a €37.7m investment from MML Ireland and Goodbody to support European growth and acquisitions, subject to regulatory approval.
Latest articles