Flexible working pilot deemed successful

ADVERTISEMENT

An 18-month long ground-breaking flexible working pilot with four of the UK’s leading construction firms has proved to be successful, with all four firms continuing with the new flexible working practices after it finished.

Major contractors BAM Construct, BAM Nuttall, Skanska UK and Willmott Dixon all took part in the pilot and now report a decline in the rate of sickness absence, with flexible working believed to be a contributing factor.

The social enterprise and flexible working experts Timewise has published a review of the impact of the pilot, called ‘Making Construction a great place to work – a view one year on’.

The review was commissioned by CITB and the four Pioneer Partners – BAM Construct, BAM Nuttall, Skanska UK and Willmott Dixon.

The findings suggest that flexible working has had a number of positive impacts – for workers in terms of reduced stress, increased well-being and for job satisfaction. For firms, in terms of enhanced performance and notably, a reduction in sickness-related absence rates.

The Pioneer Partners all report results that buck the wider UK picture. Specifically:

  • Willmott Dixon say overall sickness absences have reduced by one third since 2019.
  • BAM Construct say overall sickness absences have reduced by one tenth.
  • Skanska UK report that one-day sickness absences have more than halved.
  • BAM Nuttall has seen one-day sickness absence reduce by a third.

By contrast, analysis of ONS data by Timewise shows that the national sickness absence rate in construction has increased post pandemic, from 1.4% in 2020 to 2.1% in 20211.

While flexible working won’t be the only factor reducing the sickness absence rates experienced by the four Pioneers, Timewise says the difference in the direction of travel is significant.

It is well known that sickness absences cost the industry millions of pounds a year – last estimated at £160m in 2018, as reported by the Health and Safety at Work Executive.

The report also highlights the next barriers for the construction industry to overcome, in terms of flexible working. Key among these being the need to ensure greater fairness, by finding a way to extend flexible working to the sub-contracted workforce.

Emma Stewart MBE, the co-founder of Timewise who led the Construction Pioneers pilot and the review said: “It’s great to see a reduction in sickness absence noted by all four Construction Pioneer firms, especially given that one of the main drivers for running the pilot programme came from concern around the sector’s poor record on mental health and well-being.  Some firms are also reporting increased productivity levels through the use of hybrid working where possible, which they feel is the result of having a happier workforce. Flexible working makes both business sense and common sense.”

Suzannah Nichol is the chief executive of Build UK and commissioned the original pilot. She says: “Reducing the stresses of everyday life whether through less commuting, more suitable start and finish times, reduced hours or simply being able to attend an appointment without losing a day’s pay makes a huge difference. A happier workforce is more productive with greater job satisfaction, less sickness absence and better mental health – a virtuous circle that encourages more people to join our industry and enables businesses to grow.  To realise these benefits your company needs to take the next step and trial flexible working – I promise you won’t regret it.”

Tim Balcon, CITB Chief Executive says: “By being more flexible and inclusive, we will become a more diverse industry and open opportunities for our existing workforce, as well as new joiners from all backgrounds, to grow long-lasting careers that will help meet the skills demand across the industry.”

 

Most popular ↑

Amber heat alert puts scaffolding site welfare in focus

Scaffolding firms are being urged to review hot-weather controls...

UK construction starts tipped to rise after difficult start to 2026

UK construction activity is expected to recover from 2027...

Scaffolder ‘lucky to be alive’ after CCTV captures skylight fall

CCTV footage showing the moment a scaffolder fell through...

Scaffolding takes centre stage at Arc Project’s 24-hour warehouse race

Midland Scaffolding Services has helped deliver an unusual event...

Nearly 80% of scaffold sites fail safety checks in German state

Authorities in the German state of Hesse have launched...

Latest news

ADVERTISEMENT
More from
Latest articles

Amber heat alert puts scaffolding site welfare in focus

Scaffolding firms are being urged to review hot-weather controls as an amber heat-health alert...

AT-PAC opens Darwin branch to support northern Australia projects

AT-PAC has opened a new branch in Darwin, Northern Territory, giving contractors in northern...

JR Scaffold Services leads access project at Glasgow Royal Infirmary

JR Scaffold Services has completed a specialist scaffold and temporary roof project at the...

UK construction will need 41,200 extra workers a year, CITB warns

The UK construction industry will need an average of 41,200 extra workers each year...

Tickets go on sale for 2026 Scaffolding Excellence Awards

Tickets and tables for the 2026 Scaffolding Excellence Awards are now on sale, with...

UK construction starts tipped to rise after difficult start to 2026

UK construction activity is expected to recover from 2027 after a difficult start to...

Scaffolding takes centre stage at Arc Project’s 24-hour warehouse race

Midland Scaffolding Services has helped deliver an unusual event project after building a 270...

Layher UK brings open morning series to Livingston

Layher UK is bringing its regional open morning series to Scotland later this month,...