£21M Pay Out After Birdcage Scaffolding Deemed The Cause Of Massive Fire

ADVERTISEMENT

scaffolding

A roofing contractor has been ordered to pay more than £21 million in damages after a flick of a switch caused a catastrophic fire at a West Midlands factory.

The blaze, which tore through Mueller Europe Ltd’s copper tubing factory in Bilston in the early hours of  November 9, 2008, was caused by gas heaters which ignited a scaffolding deck put up by contractors carrying out re-roofing work.

Central Roofing (South Wales) Ltd had been working on the roof as the factory continued to operate below, London’s High Court heard.

Scaffolding was boarded and sheeted as a “birdcage” structure using flammable materials.

It enclosed two heaters that were used to warm the factory.

When the heaters were switched on the fire began.

The factory was left a smoking ruin, with part of its roof collapsed and massive damage caused to its contents.

The blaze led to a legal battle where a top judge ruled Central Roofing liable to pay Mueller a total of £21,357,889.

Mr Justice Stuart-Smith said: “The birdcage scaffold enclosed the heaters so that they were only a short distance above the surface of the scaffold’s floor.

“Once enclosed by the combustible materials of the completed birdcage scaffold, the heaters were an obvious fire hazard, which should have been appreciated by anyone who turned their mind to the question.”

The judge said that the “immediate trigger” for the fire was the inadvertent turning on of a switch and that was “the foreseeable, even predictable, consequence of the systemic failings on both sides that had preceded it.”

Although Mueller should have made sure the enclosed heaters were switched off, Central bore the primary responsibility to carry out the work safely and to point out the obvious hazard.

There had been three previous incidents when heaters were switched on when they should not have been, said the judge, who added: “Central continued to take no steps to carry out the works safely when they knew that Mueller was not routinely isolating and the failure to isolate had already caused ‘near misses’.”

Finding the Bridgend-based roofing company liable to compensate Mueller for the damage to the factory, its contents, equipment and interruption of its business, the judge said Central Roofing’s breaches of contract “were an effective or dominant cause of the fire”.

Mueller’s lawyers had argued that the scaffold deck was less than a metre away from the heaters and that a fire was “all but inevitable” if they were switched on.

Story Via: birminghammail.co.uk

SM Newsdesk
SM Newsdeskhttps://www.scaffmag.com
The staff at ScaffMag.com the leading scaffolding site for a digital generation.

Most popular ↑

CISRS says CSCS notice was served to negotiate “from a stronger position”

NASC president Sarah Klieve says CISRS served CSCS notice to negotiate from a stronger position, as Build UK says the card rules don’t block other sectors.

Lee Marley turnover hits £95.4m as profit falls

The masonry and scaffolding contractor invested £2.99m in scaffold and other fixed assets and entered 2026 with £131m of secured work.

Blencowe report details £620,000 asset sale and creditor shortfall

Newly filed administrators’ proposals detail the August equipment sale to Aiseandan Plant and forecast no dividend for Blencowe’s unsecured creditors.

Scottish scaffolding apprentices to compete at ScaffChamp 2026

A team of young scaffolders from Scotland and Northern...

China joins IASA as global membership continues to expand

China has become the latest country to join the...

Latest news

MoJ awards £56,000 prison scaffolding training contract

Platinum Rail Services will deliver courses at Holme House and Low Newton, with links to employers offering paid vacancies.
- Advertisement -
More from

Man taken to hospital after Evesham scaffolding incident

Specialist paramedics and firefighters rescued a man following a fall from scaffolding near Evesham Library. He was taken to Worcestershire Royal Hospital.

Tube Industries forecasts scaffold-tube price rise as UK CBAM nears

Tube Industries forecasts higher imported scaffold-tube costs from January 2027, but its 15p-per-foot estimate remains unverified as UK CBAM approaches.

STAR Housing seeks scaffolding suppliers for £600K framework lot

STAR Housing is seeking scaffolding suppliers for a Shropshire housing framework, with the dedicated access lot estimated at £606,625 including VAT.

Right-to-work rules extend liability through construction supply chains

Contractors face new responsibilities for labour supplied through subcontracting chains as expanded right-to-work rules come into force.
Latest articles