Ad
Friday, May 23, 2025
19 C
London

U.K. Edition

SG4:10 We Think The Answer Is Fast Guard™

- Advertisement -

If Carlsberg made advance guardrails…..  could this be the best advance guardrail system on the market??… we think so.

The Fast Guard™ Collective Fall Prevention System has been designed to meet the needs of the modern scaffolding industry and SG4:10. The system is exceptionally fast to install,

Fast Guard website

instinctive to use, requires little loading out and provides a safe working environment, in advance, for scaffolders.

The key component behind the Fast Guard system is a unique self locking coupler which attaches to a scaffold standard from any direction, without the need for tools.

From the safety of a fully protected platform couplers are loaded with traditional scaffold tube, including stop ends and returns, ready to provide continuous guardrails.

The Fast Guard couplers are then raised beyond normal reach using the Fast Guard Positioning Wand and levelled with reference to the next platform ledger to provide a correctly positioned 950mm high advance guardrail.

Following completion of the next platform the advance guardrail tube is used to provide the permanent intermediate guardrail of the working platform, or raised again to form the advance guard rail of the next platform.

When completing long elevations consisting of several lengths of tube Fast Guard Joiners are used to provide a continuous and unbroken guardrail. The Joiners are designed to lock and be unlocked from the safety of the protected platform.

Using Fast Guard to safely dismantle a scaffold is easy. Fit the Fast Guard couplers above the top existing guardrail; remove the intermediate guardrail and load into the couplers cradles; fit all joiners as required. Leaving the Fast Guard system in place for your own protection, descend to the level below and completely dismantle the scaffold as normal, including all ledgers and external sway bracing. Using the positioning wand lower the Fast Guard couplers to within comfortable reach and remove.

Scaffolders use couplers every day of their working lives, it’s second nature. A collective fall prevention system that does the same, and follows common scaffolding principles in the way it is implemented, soon becomes second nature too.

Find Out More … http://www.bsafelimited.co.uk/

- Advertisement -

Popular this week >

STA Issues Open Letter Urging Pause to CISRS Reforms

The Scaffolding Training Alliance (STA) has issued a detailed...

Scaffolder Burned in Incident at Hartlepool Nuclear Power Station

A scaffolder has been injured in an electrical incident...

Scaffold firm supports historic Glasgow church restoration

One of Scotland’s leading scaffolding providers is playing a...

New U.S. Standard for Scaffold Boards Approved by ANSI

A new standard governing the testing and rating of...

NASC Chief Registers Two Company Names Following Breakaway Training Body Launch

The Chief Executive of the National Access and Scaffolding...
- Advertisements -

Related Articles >

SG4:10 Advanced Guard

S&B Version of an Advanced Guardrail System httpv://youtu.be/cyXD_Ov-Py8 This is S&B version of an advanced guardrail system which they class as the "worlds first totally safe system." What's your opinion on this system? Let us...

Latest Topics

ScaffPlan Returns to ScaffChamp 2025 with Innovation in Tow

ScaffPlan has confirmed its return to ScaffChamp 2025 as...

PERI Staff Support Local Foodbank with Generous Donations

Employees at PERI UK’s head office in Rugby have...

BSIF Urges Workers to Share Life-Saving PPE Stories

The British Safety Industry Federation (BSIF) is calling on...

STA Issues Open Letter Urging Pause to CISRS Reforms

The Scaffolding Training Alliance (STA) has issued a detailed...
- Advertisement -

Popular Categories