Ad
Thursday, December 4, 2025

NASC withdraws safe height tables for Vol 2 of TG20:08

ADVERTISEMENT

 

Due to the impending review of TG20:08 Volume 2, which is necessary following the introduction of the European Wind Code and the publication of BS EN1991-1-4:2005 A1:2010 (European Wind) and the National Annexe to BS EN1991-1-4:2005 A1:2010, all the safe height tables, text and diagrams associated with wind loading covered in TG20:08 Volume 2 are no longer valid and the tables detailed below should not be used, with immediate effect:

Tables being reviewed:

Table 29 – 31 (Pages 154 – 159) Safe heights for Basic independent tied scaffolds fully ledger braced with fully loaded inside boards.

Table 34 – 36 (Pages 165 – 168) Safe heights for Basic independent tied scaffolds part ledger braced.

Tables A1 – A24 (Pages 172 – 219) Appendix A – Tables of maximum safe eight for fully ledger braced Basic Scaffolds

Tables B1 – B12 (Pages 222 – 233) Appendix B – Tables of maximum safe height for part ledger braced Basic Scaffolds with line of ties at alternate lifts.

The NASC are currently reviewing the data associated with the wind load calculations and intend to issue revised data shortly. Until this time the NASC advises all users of TG20:08 – Volume 2 that the safe heights identified in the tables mentioned above will have to be determined from first principles.

For more information please visit the NASC website 


ADVERTISEMENT

Popular Categories

Latest news

Connolly Scaffolding strengthens partnership with TRAD UK in £3.5m investment

Connolly Scaffolding Ltd has agreed a further £3.5 million investment in TRAD UK’s Plettac Metrix system, reinforcing a partnership that has shaped both businesses...

Benetics introduces AI voice tool to cut site paperwork

A German construction technology firm has launched an AI-powered voice assistant designed to help site teams cut paperwork and speed up reporting. Benetics, based in...

Scaffolders at Sullom Voe Terminal walk out over pay dispute

Around 60 scaffolders, painters, insulators, and supervisors at the Sullom Voe Terminal in the Shetland Islands have staged a 24-hour walkout in an escalating...

Hong Kong contractors ‘hid unsafe scaffolding netting’ as tower fire toll rises to 151

Investigators in Hong Kong say contractors used unsafe scaffolding netting at the housing estate destroyed by last week’s deadly fire, and then tried to...

Costs climb again on Manchester Town Hall project as delays worsen

The cost of restoring Manchester Town Hall has risen by a further £95m, with completion now pushed back to spring 2027. The Grade I-listed...

CSCS Alliance appoints new Chair

The CSCS Alliance has confirmed the appointment of Marion Marsland as its new Chair, marking a significant leadership change for the body representing 37...

ScaffEx26 set for growth as NASC prepares expanded programme

NASC says ScaffEx26 is on track to grow further, with early exhibitor demand already exceeding last year’s levels. The trade body confirmed to Scaffmag that...

New Gale Force Bolt introduced to honour industry figure Alan Gale

Tilbury Scaffolding has introduced a new fixing in honour of Alan Gale, a widely respected figure in the scaffolding supply sector whose career spanned...

Scaffolding under scrutiny after Hong Kong tower blaze kills 128

This article has been updated as authorities confirm a revised death toll and launch a criminal and corruption inquiry. At least 128 people have died,...

Budget 2025: NASC warns of rising costs as new tax increases hit construction firms and housing delivery stalls

The Autumn Budget has drawn strong criticism from scaffolding, construction and housebuilding leaders, who warn that a combination of higher wage costs, frozen tax...

Latest news

ADVERTISEMENT

The magazine

Issue 27 | Past issues >>

Popular

Connolly Scaffolding strengthens partnership with TRAD UK in £3.5m investment

Connolly Scaffolding Ltd has agreed a further £3.5 million...

Scaffolders at Sullom Voe Terminal walk out over pay dispute

Around 60 scaffolders, painters, insulators, and supervisors at the...

Hong Kong contractors ‘hid unsafe scaffolding netting’ as tower fire toll rises to 151

Investigators in Hong Kong say contractors used unsafe scaffolding...

CISRS reforms face delay as new QAC Chair withdraws

CISRS has reopened its search for a new Chair...

ScaffEx26 set for growth as NASC prepares expanded programme

NASC says ScaffEx26 is on track to grow further,...

Related articles

Hong Kong contractors ‘hid unsafe scaffolding netting’ as tower fire toll rises to 151

Investigators in Hong Kong say contractors used unsafe scaffolding netting at the housing estate destroyed by last week’s deadly fire, and then tried to cover it up during inspections. The death toll at Wang...
ADVERTISEMENTS

Latest topics

CISRS reforms face delay as new QAC Chair withdraws

CISRS has reopened its search for a new Chair...

Connolly Scaffolding strengthens partnership with TRAD UK in £3.5m investment

Connolly Scaffolding Ltd has agreed a further £3.5 million...

Benetics introduces AI voice tool to cut site paperwork

A German construction technology firm has launched an AI-powered...

Scaffolders at Sullom Voe Terminal walk out over pay dispute

Around 60 scaffolders, painters, insulators, and supervisors at the...
ADVERTISEMENTS