IDH was incorporated in July 2011 and established to provide specialist Scaffold DesignFormwork Design & general Temporary Works Design consultancy serving Sub-Contractors, Main Contractors and Client developers.

How Do Ties Work ?

To stabilise a scaffold we tie it to the adjacent building as the scaffold is erected.  Conventionally this is done by means of an anchor fixing in to the façade and then a tie tube on doubles across both standards and all within 300mm of the ledger / standard interface.  This point being a node (point of NO DE-flection).

Depending on a number of factors such as geographic location, netting, sheeting, height and load we determine in the design process what tie pattern to adopt and the frequency of ties.

Ties however, undertake more than one function. 

Firstly they prevent the scaffold from pulling away from the building – but if this is the case why not fix them at all standards, or for that matter at every 4 standards for instance.

In addition to providing this pull restraint, they also stabilise the scaffold from swaying parallel to the building and contribute to the effective length of the standard in question.

ties

Sway stability parallel to the building is provided by a combination of the tie tube and the face brace.  By installing the correct sway bracing, the outside line is prevented from moving parallel to the building.  By securing the tie tube to the building façade and the outside line we now have a tube which is prevented from movement at both ends.  When the inside line is now secured to this tube (with doubles) the inside line is now also prevented from moving parallel to the building by the bending resistance of this tie tube.  This is why inside lines are not sway braced!

In some designed circumstances it may be a requirement to tie to the inside line only or miss ties altogether.  When these scenarios occur the scaffold should be designed as we no longer have that sway restraint present and alternative measures need to be considered such as plan bracing or V-ties.

For more explanation on this and other technical scaffold design subjects visit the IDH blog: http://www.idh-design.co.uk/blog/

Author: Tim Burt on Google+

- Advertisement -

Popular Categories

Most Read >

Scaffolders Could Down Tools in Heatwave Under New HSE Proposals

Scaffolders could be given the right to stop work...

New software aims to transform scaffolding business management

A new digital platform designed specifically for the scaffolding...

ITP invests in R&D hub to advance scaffolding protection products

A Yorkshire-based manufacturer of construction textiles is creating a...

NASC and SAIA Join Forces to Elevate Global Scaffold Standards

The National Access & Scaffolding Confederation (NASC) and the...

Pilosio Partners with Sky Climber to Bring FlyDeck System to North America

Italian scaffolding manufacturer Pilosio has entered the North American...
- Advertisements -

Related Articles >

ITP Appoints New Sales Director to Propel Growth Strategy

Industrial Textiles and Plastics (ITP) Ltd, a leading manufacturer of scaffold sheeting and related materials, has announced the appointment of Matt Thompson as Sales Director.  The move comes as part of ITP's strategic plan...

Latest Topics

GEDA hoist supports restoration of historic Belgian church tower

Work is underway to restore the imposing tower of...

New software aims to transform scaffolding business management

A new digital platform designed specifically for the scaffolding...

SAIA announces 2025 award winners in Fort Worth

The Scaffold & Access Industry Association (SAIA) has announced...

SARNZ chief executive to step down after four years

The head of Scaffolding, Access & Rigging NZ Inc...
- Advertisement -