Powerclad Sheeting Prevails Over Hostile Offshore Conditions

ADVERTISEMENT

ipt Powerclad Flame Retardant Filter Sheeting from Industrial Textiles and Plastics (ITP) has been successful in withstanding the rigours of the exposed conditions in the North Sea to facilitate the refurbishment of an oil rig derrick. Maintenance and inspection work on offshore oil rigs is undoubtedly complicated and dangerous, a problem magnified on those located in the North Sea.  Recent repair work to the derrick on the Bideford Dolphin, situated off the coast of Norway was a particular challenge due to the extreme wind speeds.  The two-fold effect of these conditions is an accelerated corrosion of the rig structure, and a difficulty in repair and refurbishment works. Built in 1975, the Bideford Dolphin forms part of the Dolphin drilling fleet that consist of 2 deep water units, 5 semi-submersible drilling rigs, as well as a support vessel and accommodation unit.  Dolphin Drilling is one of the longest established independent drilling contracting firms in the offshore arena tracing its roots back to the earliest offshore exploration activity in the North Sea in the mid 1960’s. Specialising in innovative access solutions for fabric maintenance and inspection, Skanits AS was selected to undertake the repair work to the derrick on the Bideford Dolphin.  The containment system on the derrick was erected in 48 hours, and remained secure for the 19 days of the works, protecting the workforce and allowing drilling operations to continue. Alf Rune Falck, Director of Skanits AS said: “The Powerclad sheeting withstood the fierce conditions and provided excellent protection for the workforce and equipment.  The use of the safe work zone system enabled us to work at several levels at one time, saving us a total of 10 days.” Managing Director at ITP, Marc van der Voort said:

“Powerclad Filter Sheeting provides exceptional weather protection in exposed locations and harsh climates such as the North Sea.  It is a closed woven mesh for improved ventilation, as air permeability is desirable in many installations to contain debris and dust, disperse paint solvents and dry out interior works.   Our expertise is in Flame Retardant materials, which should always be used for works on occupied buildings or on safety critical installations such as shipyards and refineries.”

Working within a demanding framework of time, budget and safety limitations, the project was successfully delivered against all criteria with no disruption to the daily operations of the rig.

ADVERTISEMENT

Popular Categories

Latest posts

NASC warns members over online conduct in new media policy

The National Access and Scaffolding Confederation said the new Social Media and General Media Policy sets expectations for how its members, CISRS centres and...

Two workers killed in Spain after mast climbing platform collapse

Two workers have been killed following the collapse of a twin mast climbing work platform in Benidorm, Spain. The incident happened on Wednesday, 22 April,...

Brogan wins Manchester student accommodation access package

Brogan Group has secured the powered access package for a student accommodation building in Manchester. The access specialist will provide several passenger and goods hoists...

‘Not every scaffolder is ok’: Alan Osborn backs mental health campaign at ScaffChamp

Alan Osborn is set to shave his head at ScaffChamp 2026 as part of a campaign to raise £5,000 for men’s mental health and...

Baton opens early adopter programme for scaffolding contractors

Baton has opened applications for its Early Adopter Programme, giving scaffolding contractors early access to a software platform designed specifically for construction subcontractors. The company...

SCA joins Coriant in move to widen access and industrial services capability

Coriant has announced the acquisition of specialist contractor SCA, in a move that further expands the group’s capabilities in access, temporary containment and industrial...

Robot named Douglas begins work on Tilbury Douglas site

Tilbury Douglas has begun using a humanoid robot to carry out administrative and data-collection tasks on a live construction site. The contractor says the...

HAKI reports sharp UK sales drop as construction starts stall

The Swedish-listed scaffolding and access safety group said UK revenues fell to SEK 52 million (£4.2 million) in the three months to 31 March,...

CISRS appoints Kathryn Bowe after delay to quality committee reforms

CISRS has appointed Kathryn Bowe as full-time Chair of its Quality Assurance Committee, months after the organisation was forced to restart recruitment for the...

NASC throws support behind first International Scaffolding and Access Day

NASC has thrown its support behind the first International Scaffolding and Access Day, as the UK industry prepares to join a new annual campaign...

Latest news

Spring Issue #29 | Past issues >>

Latest topics

Most popular ⚡︎

Two workers killed in Spain after mast climbing platform collapse

Two workers have been killed following the collapse of...

Robot named Douglas begins work on Tilbury Douglas site

Tilbury Douglas has begun using a humanoid robot to...

Baton opens early adopter programme for scaffolding contractors

Baton has opened applications for its Early Adopter Programme,...

Scottish offshore workers urged to consider scaffolding careers

The Construction Industry Training Board is targeting workers from...

SCA joins Coriant in move to widen access and industrial services capability

Coriant has announced the acquisition of specialist contractor SCA,...

Related articles

ADVERTISEMENTS