Innovations: Advanced Guard

ADVERTISEMENT

The Advanced-Guard’s Easy-Fit system is a simple, two part guard-rail system, designed with strict safety and speed of installation in mind. It’s unique ‘overlap and slide’ fittings give ultimate flexibility and do not require qualified scaffolders for installation.

Once in place, Easy-Fit system allows guardrails on subsequent lifts to be installed from the safety of a fully guarded safe zone, keeping installers safe at all times.

A unique patent applied for (PCT/GB2011/051896) stanchion post system is fixed to the scaffold standard from the lift below. Easy-Fit guardrail panels slide up the stanchion posts, whilst locators fix the panel in place. At all times, scaffolding operatives are working from behind a safe barrier.

The Easy-Fit panels are left in-situ for the duration of the project, resulting in a finished scaffold, with fully guard-railed lifts and a completely gap free working platform. Scaffold inspectors can easily see that the scaffold has been installed in accordance with SG4.10 and will be confident that the scaffold can be dismantled safely.

The Easy-Fit panels incorporate a built in toeboard and brickguard which prevents tradesmen interfering with the units. When using conventional equipment, brickguards are regularly removed, rendering the scaffold platform unsafe and unfit for use.

The Easy-Fit system is the most flexible, total-security, scaffolding system available. Not only does it provide you with a single system solution to all your scaffolding needs, but saves you labour time and does not require qualified scaffolders to erect the safety zones on each lift.

Easy-Fit Posts

There are two simple to install support fittings. One Easy-Fit post is for use exlusively with tube & fitting scaffolding (A), the other, for either tube & fitting or system scaffold (B).

Easy-Fit Panels

There are three sizes of easy-Fit panel, designed to overlap and slide-to-fit, providing a fully braced safety-zone, from which further lifts can be erected in full safety. The 3 sizes and the unique ability to overlap panels, provides ultimate flexibility. However, should you require it, bespoke panels can also be provided.

Health & Safety 

The Easy-Fit system has also been rigorously tested and complies with all current legislation and best practise recommendations within the scaffolding and construction industry, including:

  • The Health and Safety at Work etc Act 1974
  • The Work at Height Regulations 2005
  • The Manual Handling Operations Regulations 1992
  • NASC; SG4;10
  • Edge barrier strength tests: EN13374:2004e Class A Edge Protection
Contact
 Web: www.advanced-guard.com |Email:  [email protected] | Tel: 0844 858 4084

 

ADVERTISEMENT

Popular Categories

Latest posts

NASC gains formal role in CITB levy consensus process

The National Access and Scaffolding Confederation (NASC) has been granted Prescribed Organisation status by the Construction Industry Training Board (CITB), giving the trade body...

New platform aims to bring instant scaffolding quotes to UK market

A London-based roofing contractor has launched a new digital platform designed to simplify how scaffolding is sourced and booked. The platform, called ScaffLink, allows homeowners...

Inflatable tent system installed at height during £38m Bolton hospital project

Robertson Construction has installed a series of inflatable roofing tents as part of a major redevelopment programme at the Royal Bolton Hospital. The air-filled structures...

PepsiCo begins £3.6m rooftop solar project at Leicester distribution centre

PepsiCo UK has begun construction of a £3.6 million rooftop solar installation at its Southern Region Distribution Centre in Leicester. The project will see solar...

Cardiff clears path for Wales’ tallest tower

Plans for a landmark 178-metre tower next to Cardiff Central Station and the Principality Stadium have secured planning approval, paving the way for what...

Speller Metcalfe appointed for £28m Atherstone leisure centre redevelopment

North Warwickshire Borough Council has appointed construction firm Speller Metcalfe as the principal contractor for a £28 million redevelopment of the leisure centre in...

Second chances and scaffolding: the man giving ex-offenders a route back into work

When Aaron King talks about turning points, he does not hesitate. "It was when my kids had to come and see me in prison," he...

Scaffold supplier TRAD UK flags potential price adjustments as global tensions rise

TRAD UK has warned customers that external market pressures linked to the ongoing crisis in the Middle East could lead to price adjustments in...

Don’t rely on digital tools to solve your problems – a strong management approach is critical

Scaffolding contractors have a lot on their plates. There is technical and legislative compliance to meet on every job, while also running and growing...

The digital foundations behind scaffolding’s next tech shift

NASC and CISRS have completed a comprehensive digital overhaul that marks a fundamental shift in how the scaffolding sector manages training, compliance and communication. Since...

Latest news

Magazine

Spring Issue #29 | Past issues >>

Trending now ⚡︎

Young workers least likely to discuss mental health, research shows

More than one in three UK tradespeople say their...

CITB reshapes training funding with new large employer fund

The Construction Industry Training Board (CITB) has announced changes...

Second chances and scaffolding: the man giving ex-offenders a route back into work

When Aaron King talks about turning points, he does...

Scaffmag Issue 29 released with focus on technology, skills and industry change

Scaffmag has released Issue 29, bringing together interviews, analysis...

Scaffold supplier TRAD UK flags potential price adjustments as global tensions rise

TRAD UK has warned customers that external market pressures...

Related articles

Latest topics

Teen in coma after scaffolding accident on Fife housing project

A teenager remains in a coma after being seriously...

NASC gains formal role in CITB levy consensus process

The National Access and Scaffolding Confederation (NASC) has been...

New platform aims to bring instant scaffolding quotes to UK market

A London-based roofing contractor has launched a new digital...

Inflatable tent system installed at height during £38m Bolton hospital project

Robertson Construction has installed a series of inflatable roofing...
ADVERTISEMENTS