An Agile Approach to Health & Safety with Site Supervision

ADVERTISEMENT

Billy Jones, Director of scaffolding company, Millcroft, discusses the importance of supervision in ensuring site risks are addressed in real-time and health and safety is maintained.

A meticulous approach to health and safety is integral to the success of any scaffolding business because the industry carries inherent hazards which must be managed effectively to reduce risk to employees, clients, delivery partners and the public. 

Embedding Supervision in a Team Approach

Health and safety is embedded in each project long before the installation takes place on site. The expertise of the design team, the maintenance of scaffolding materials, the safety of vehicles and the training of personnel all have a role to play in delivering safety and reducing risk.

Health and safety measures are designed into the scaffolding solution and the risk assessment and method statement consider all potential health and safety issues so that hazards can be controlled. Once the project is on-site, however, risks can change.

There may be changes to the scope of work, revisions to staffing, challenging weather conditions, factors relating to other trades…one of the only certainties about risk is that it is never static, so a project team needs to be prepared to adapt.

As a result, the risk assessment carried out at the beginning of the project may not always be sufficient to anticipate risk throughout the programme, because new hazards can become apparent as the job progresses. 

It’s for these reasons that Millcroft decided some time ago to shift the Site Supervisor role from a desk-based responsibility, visiting sites daily and returning to the office to review works, to a site-based responsibility within the Foreman’s role. The move means that site-specific risk assessments and method statements can be updated in real-time in response to any changes to workplace conditions.

The Foreman is responsible for identifying and managing risk on-site as part of a collaborative health and safety process which also includes the wider Millcroft team. Careful planning includes input from both the SHEQ and transport departments to co-ordinate safety on-site and efficient planning of materials, routes and vehicle allocation.

Monitoring of projects by Millcroft’s managers and contracts managers, alongside regular director visits, audits and safety walk rounds, ensures every site is checked and scrutinised by a full team of professionals.

Training and Experience

The role of the supervisor has always been a skilled job, requiring a professional who is both well-qualified and well-suited to the role. As a company that puts health and safety at the heart of everything we do, Millcroft has always looked beyond the standard role requirements when appointing and training foremen as supervisors.

Training for Millcroft Supervisors includes at least a five-day Site Management Safety Training Scheme (SMSTS) course, along with in-house mental health training and experience in delivering complex scaffolding projects.

All Millcroft foremen are highly qualified in general site management, health and safety and safety leadership, which makes their existing skills a good fit for the Supervisor responsibility. They all have experience of identifying hazards and implementing control measures as part of day-to-day site management.

“It’s not just training and experience that are essential to the role of supervisor”

Their role involves completing a daily checklist of hazards to mitigate risk, daily risk assessment reviews and pre-start briefings for both the Millcroft team and those working in the area at the beginning of every shift. This includes having an understanding of both Millcroft’s activities, and associated risk factors. The Millcroft Foreman questions all those who attend the daily briefing to verify their understanding and will not allow work to commence until he is confident that all risks have been controlled.

Having a Supervisor based on site means that day-to-day changes to hazard and risk can be assessed in the context of site-specific and up-to-date knowledge from the beginning of the working day. Projects do not always run to schedule and supervisory responsibility on-site means that risk can be monitored aligned to actual progress – for the scaffolding and other trades – not to the programme alone, and new safety issues can be included in the daily briefing.

The Right Person for the Job

It’s not just training and experience that are essential to the role of supervisor; a natural aptitude for the job is also important. It’s a responsibility that requires commitment, a can-do attitude and initiative, along with leadership abilities, attention to detail and excellent communication skills.

The role involves taking a tough approach to ensuring that everyone behaves safely on site and reports any hazards, but it also involves taking a nurturing approach to gaining trust and supporting the team. 

Above all, the supervisor role delivers most value in reducing risk and ensuring productivity when it is delivered with a collaborative approach. By combining the duties of Foreman and Supervisor in a single site-based role, health and safety best practice is embedded in day-to-day operations and the team member leading the project on site drives a safety-first culture for all personnel.

ADVERTISEMENT

Popular Categories

Latest news

ULMA Construction eyes UK expansion with Des Moore leading setup

European scaffolding and formwork giant ULMA Construction is preparing to enter the UK market, with industry leader Des Moore steering the launch phase. The Spanish-based...

PERI UK’s Terry Hall recognised as ‘Unsung Hero’ for driving formwork safety reform

Terry Hall, Field Services Manager at PERI UK, has been honoured with the ‘Unsung Hero’ award at this year’s CONSTRUCT Day for his work...

Scaffolders urged to tighten safety as climate change brings fiercer storms

Extreme weather is exposing poor practices across the scaffolding industry, as insurance specialists urge contractors to tighten safety procedures in response to increasingly severe...

Connolly Scaffolding unveils major new Salford base as part of multi-million-pound expansion

Connolly Scaffolding has completed a major expansion with the opening of a new 26,000 sq ft warehouse and yard in Salford – a move...

Surge in construction apprenticeships as CITB support drives 61% rise

The Construction Industry Training Board (CITB) has reported a sharp rise in apprenticeship starts, with more than 1,500 new apprentices supported by its New...

URTIM powers Turkey’s first floating gas platform

Turkey has taken a major step towards energy independence with the completion of its first floating natural gas production platform, the Osman Gazi. At the...

CISRS announces suite of new safety and inspection courses

The Construction Industry Scaffolders Record Scheme (CISRS) has announced a series of new and updated training courses aimed at improving safety, technical standards, and...

House-building recovery delayed until 2029, industry warns

The Construction Products Association warns UK house-building will not recover to pre-pandemic levels until 2029 or 2030, urging government support for first-time buyers to prevent further insolvencies and job losses.

Staht secures largest ever distribution deal with Leach’s

One of the UK’s leading testing technology firms, Staht, has announced its largest ever distribution agreement after joining forces with Leach’s. The partnership will expand...

Avontus to host free webinars on digital scaffold management this November

Avontus Software has announced a series of free, live webinars in November designed to help contractors overcome the everyday challenges of tracking and managing...

Latest news

ADVERTISEMENT

The magazine

Issue 27 | Past issues >>

Popular

CISRS announces suite of new safety and inspection courses

The Construction Industry Scaffolders Record Scheme (CISRS) has announced...

URTIM powers Turkey’s first floating gas platform

Turkey has taken a major step towards energy independence...

Connolly Scaffolding unveils major new Salford base as part of multi-million-pound expansion

Connolly Scaffolding has completed a major expansion with the...

House-building recovery delayed until 2029, industry warns

The Construction Products Association warns UK house-building will not recover to pre-pandemic levels until 2029 or 2030, urging government support for first-time buyers to prevent further insolvencies and job losses.

Scaffolders urged to tighten safety as climate change brings fiercer storms

Extreme weather is exposing poor practices across the scaffolding...

Related articles

Kirtanlal and Al Masaood partnership set to reshape the Middle East scaffolding sector

Kirtanlal Scaffolding & Formwork has announced a new strategic partnership with Abu Dhabi-based Al Masaood Group, one of the UAE’s most established and respected industrial conglomerates. The alliance aims to combine Kirtanlal’s specialist scaffolding...
ADVERTISEMENTS

Latest topics

Kirtanlal and Al Masaood partnership set to reshape the Middle East scaffolding sector

Kirtanlal Scaffolding & Formwork has announced a new strategic...

ULMA Construction eyes UK expansion with Des Moore leading setup

European scaffolding and formwork giant ULMA Construction is preparing...

Scaffolders urged to tighten safety as climate change brings fiercer storms

Extreme weather is exposing poor practices across the scaffolding...
ADVERTISEMENTS