Following on from a previous featured piece, ‘The Robots are coming… and we are building them’. I was inspired to detail my own thoughts on paper. Now, if you have not read this article, I urge you to do so. The concerns of Simon Boyes were; if we are hindering the current and future generations of scaffolders to be creative thinkers. I completely agree with his concerns. As a scaffold designer, I could well be part of the problem.

When I first began this trade, certification was not the defining attribute it is today. There were untrained (in construction college terms) who were incredible scaffolders and truly creative thinkers. Even if there was an Advanced card on-site, this did not determine rank. Rank was based on an unspoken agreement from construction merit.

Now, this is not to say I do not believe in the construction colleges or their training and certification regimes, I do. I really do. I want more! However, it must be based on time served and construction merit. 

All too often now, new starts can begin as a labourer then depending on funds available to them or favourability from their employers can progress to an Advanced scaffolder essentially in a mere two years. Here is my issue. In the industry of delivering someone somewhere, does not matter who or where, as an industry we are to get you there safely. How can all this be delivered and absorbed within two years? Scaffolding is a vast industry, from assembling structures for new build properties – to front elevations on busy city centre streets – to enclosed space platforms within substations – to hangers off a rig in the middle of the sea.

CISRS CPD Training

This Advanced status can be claimed by operatives who have only ever gone round housing plots, then effectively could secure a role of instructing a part two trained individuals who have spent their working life offshore developing their skills in how to construct that previously mentioned hanger amongst other structures. This is not to say I favour one style of scaffolding to the next, but they are very different. I have found the same concerns in reverse when an offshore operative was the chargehand on a housing site and the setting out procedure was ‘interesting’. 

Now, back to the creative thinking problem. In an industry where nepotism is all too obvious, I would like to remove the opportunity for the “who you know” and bring it back to “what you know”.

In an industry so physically demanding as ours, it is great to see the progression in monetary terms so quick for our operatives. However, reaching the salary cap at effectively 20 years old and believing you know there is all to know is a concern. Until scaffolding labourers can ‘read’ a job and have all components laid out for their team for the next lift, I do not believe a part one course should be offered or a tool belt strapped around their waist. Understanding the process is so important in developing the creative mind of a scaffolder. Once individuals have the tool belt status it is clear, they do not like to continue labouring. However, by not enduring the process of not only supplying the components but also watching and learning, labourers themselves as well as us who allow these practices to happen, stymie the development of creative and understanding minds within the industry.

Obviously, not just now with the current pandemic where operatives should remain within one squad to prevent transmission possibilities. However, something I found extremely beneficial in learning my trade, was being the labourer within many different squads. Offering the opportunity to learn from many different chargehands. Learning different possibilities and solutions to similar problems. A common belief within the industry is that giving the same problem to a range of scaffolders would bring a range of different structures. As long as they are safe and provide access to the required area then that is the fundamentals of what we are all trying to provide. I believe that this is extremely beneficial to the new era. Obviously, this is constrained where bespoke design is implemented. However, within “standard scaffolds” that are covered within TG20, where design input is not required then this is where creative thinking scaffolders need to be nurtured and developed so they can perform.

So, delay the training, advance the learning and cultivate the creative minds of scaffolders of the future!

ADVERTISEMENT

Popular Categories

Latest news

Cars damaged after scaffolding collapses on Hove residential street

Several vehicles were damaged yesterday after scaffolding collapsed onto a residential street in Hove. No one was injured. The industry body NASC has today...

Scaffmag’s Top Ten stories of 2025

As 2025 draws to a close and we prepare for the festive break, we're taking a moment to reflect on another remarkable year for...

Spartan Scaffolding eyes expansion with new Newport Docks facility

One of Wales’ established scaffolding contractors has secured a new base at Newport Docks as part of its growth plans across South Wales and...

JR Group charity gala raises £170,000 for Reverse Rett

One of Scotland’s leading construction and scaffolding businesses has raised £170,000 for the charity Reverse Rett after hosting a major fundraising gala to mark...

Norway joins IASA as international membership continues to grow

Norway has become the latest country to join the International Access and Scaffolding Association (IASA), following the Federation of Norwegian Industries’ decision to become...

Peoples Safety Ltd showcases AT-PAC’s Ringlock versatility on Edinburgh theatre redevelopment

Peoples Safety Ltd’s deployment of the Ringlock modular system has shown how engineered components can bring the adaptability, accuracy and efficiency that sensitive, multi-phase...

Scaffmag expands into US market with SAIA partnership

Scaffmag is expanding into the United States through a strategic multi-year partnership with the Scaffold & Access Industry Association to produce SA Magazine from...

Mark Parkin leaves role as Strategic Director at the Scaffolding Association

The Scaffolding Association has confirmed that Mark Parkin has stepped down from his position as Strategic Director. In a statement to Scaffmag, the Association said:...

PERI systems boost efficiency on £200m Walsall waste facility

Specialist contractor Careys is using advanced formwork and scaffolding systems from PERI UK to construct the 40-metre reinforced concrete structure at the Walsall Energy...

Scaffolders among workers hit by alleged coordinated layoffs at Sellafield, says Unite

Unite has accused a group of major contractors at Sellafield of issuing coordinated layoffs during ongoing industrial action, alleging that scaffolders and other construction...

Latest news

ADVERTISEMENT

Magazine

Winter Issue #28 | Past issues >>

Popular

Breaking News: NASC President Wayne Connolly has died

It is with great sadness that we have to...

Mark Parkin leaves role as Strategic Director at the Scaffolding Association

The Scaffolding Association has confirmed that Mark Parkin has...

Cars damaged after scaffolding collapses on Hove residential street

Several vehicles were damaged yesterday after scaffolding collapsed onto...

Peoples Safety Ltd showcases AT-PAC’s Ringlock versatility on Edinburgh theatre redevelopment

Peoples Safety Ltd’s deployment of the Ringlock modular system...

PERI systems boost efficiency on £200m Walsall waste facility

Specialist contractor Careys is using advanced formwork and scaffolding...

Related articles

ADVERTISEMENTS

Latest topics

Breaking News: NASC President Wayne Connolly has died

It is with great sadness that we have to...

Cars damaged after scaffolding collapses on Hove residential street

Several vehicles were damaged yesterday after scaffolding collapsed onto...

Scaffmag’s Top Ten stories of 2025

As 2025 draws to a close and we prepare...

Spartan Scaffolding eyes expansion with new Newport Docks facility

One of Wales’ established scaffolding contractors has secured a...
ADVERTISEMENTS