Farrens (Construction) Ltd
Rosie Maternity Hospital where the incident happened.

Belfast-based Farrans Construction Ltd has been prosecuted by the Health & Safety Executive (HSE) after a engineer was severely injured when he fell down a lift shaft at a construction site in Cambridge.

Farrans Construction Ltd was prosecuted yesterday and fined £10,000 and £5,225 costs after an investigation by the HSE found that guard-rails placed across the entrance to the lift shaft did not meet the statutory height requirement.

Cambridge magistrates heard that Mr Moore, an experienced lift engineer, was working on the top floor of a new three-storey annex under construction, and was preparing the shaft ahead of a lift installation. He was about to bring up further equipment from a floor below when he fell into the lift shaft and fell nine metres. He was discovered at the bottom of the shaft by a subcontractor working nearby.

Terry Moore, 51, from Wisbech, suffered fractures to his left foot, shoulder, lower spine and pelvis, and was unable to work for several months as a result of the incident at Rosie Maternity Hospital – part of Addenbrooke’s – on 29 March 2012.

The HSE’s investigation found that that the guard-rails placed across the entrance to the upper floor shaft were 908mm high, which is 42mm short of the 950mm required by regulations.

The court was told that although it could not be proven that the height discrepancy was a factor in the fall, it was a serious safety failing.

Farrans Construction Ltd, of Dunmurry, Belfast, was fined £10,000 and ordered to pay £5,225 costs after pleading guilty to a single breach of the Work at Height Regulations 2005.

HSE inspector John Berezansky said:

“Farrans Construction Ltd failed to implement a well-known industry standard regarding the height of the barriers across the lift shaft entrance.

“This standard has been in place for a considerable number of years, and it clearly states that the top guard rail must be at least 950mm above the edge from which any person is liable to fall. That is an absolute requirement and the onus is on employers to ensure this standard is met at all times.

“Construction work is a high-risk activity where falls account for a large proportion of all deaths and serious injuries. The end result here is that Mr Moore, an experienced engineer, sustained horrific injuries and could easily have been killed.”

ADVERTISEMENT

Popular Categories

Latest news

David Brown returns as President and Chair of NASC and CISRS

Redaction notice An earlier version of this article referred to “interim” leadership arrangements at NASC and CISRS. This was incorrect. David Brown has formally resumed the...

The story behind Scaffolder’s Day, and how it became an industry fixture

Each year on 14 January, the scaffolding industry marks Scaffolder’s Day. There is no formal programme, no governing body and no official endorsement. Yet...

Safety & Access adds CITB Site Safety Plus courses

Safety & Access has added CITB Site Safety Plus (SSP) courses to its training portfolio, extending its offer to include site safety and management...

Embrace Building Wraps marks climate milestone with 20,500 trees planted

Embrace Building Wraps has begun 2026 by confirming that it has helped plant more than 20,500 trees as part of a long-running climate commitment...

Scaffolding project manager convicted after temporary bridge collapse

A Finnish court has handed a suspended prison sentence to a scaffolding firm project manager over the collapse of a temporary pedestrian bridge in...

Funeral details confirmed as NASC publishes tribute to Wayne Connolly

The National Access & Scaffolding Confederation has published a detailed obituary for its President and Chair, Wayne Connolly, alongside confirmation of funeral arrangements following...

The real value of competition in scaffolding

Anyone who’s ever worked in a management or sales position in scaffolding will tell you that competitors are always on your mind. Perhaps you...

Engineering excellence in the Alps: Pilosio’s Olympic challenge

When the iconic Zuel ski jump in Cortina d'Ampezzo needed renovation ahead of the 2026 Winter Olympics, the project demanded more than standard scaffolding...

Layher Allround supports complex heritage restoration at Royal Victoria Country Park

Layher UK has worked in close partnership with Skill Scaffolding on a demanding heritage restoration project at the Abbey in Royal Victoria Country Park,...

GEDA transport system supports renovation of Augsburg landmark

Renovation work is continuing at the Perlachturm in Augsburg, a historic city in the German state of Bavaria, close to the Austrian border. The tower,...

Latest news

ADVERTISEMENT

Magazine

Winter Issue #28 | Past issues >>

Popular

The story behind Scaffolder’s Day, and how it became an industry fixture

Each year on 14 January, the scaffolding industry marks...

Scaffolding project manager convicted after temporary bridge collapse

A Finnish court has handed a suspended prison sentence...

David Brown returns as President and Chair of NASC and CISRS

Redaction notice An earlier version of this article referred to...

Safety & Access adds CITB Site Safety Plus courses

Safety & Access has added CITB Site Safety Plus...

Embrace Building Wraps marks climate milestone with 20,500 trees planted

Embrace Building Wraps has begun 2026 by confirming that...

Related articles

ADVERTISEMENTS

Latest topics

POP UP Products marks 20 years in business

Access equipment manufacturer POP UP Products is marking its...

David Brown returns as President and Chair of NASC and CISRS

Redaction notice An earlier version of this article referred to...

The story behind Scaffolder’s Day, and how it became an industry fixture

Each year on 14 January, the scaffolding industry marks...

Safety & Access adds CITB Site Safety Plus courses

Safety & Access has added CITB Site Safety Plus...
ADVERTISEMENTS