Ad
Thursday, November 20, 2025

Harsco’s Integrated Access Solution Helps Construction Of New Waste-To-Energy Plant

ADVERTISEMENT

Harsco

A variety of access, formwork and shoring systems from Harsco Infrastructure (formerly SGB) were used to construct a new £205 million state-of-the-art Energy from Waste plant in Ardley, North Oxfordshire.

Harsco designed and supplied the formwork required for the creation of 24m deep reinforced waste bunker which will accommodate up to 5,000 tonnes of waste. The bunker is being constructed using a combination of Harsco’s LOGIK®60 wall formwork panel system, MULTIFORM climbing brackets to create access platforms, and lightweight GASS® aluminium shoring. The GASS® system is being used to provide safe working access for the creation of the numerous intermediate concrete floor slabs that will be included inside the waste bunker.

Other products and services supplied include EXTRAGUARD™ edge protection system, to ensure maximum site safety, plus DU-AL™ and Mk II Soldier aluminium beams to create a variety of structures for wall and soffit support. These were complemented by Harsco’s CUPLOK® which was used to create temporary staircases up to 24m in height.

“As on previous projects where we have worked with Harsco, their expertise and great range of products and systems have come together to create an excellent solution to our needs. We have a sole supplier agreement with Harsco for formwork and falsework requirements and have recently been working with them on other waste-related projects in Lincoln, Shropshire and Stafford,” says John Holmes, Senior Works Manager, Clugston Construction Ltd.

When complete in 2014 the plant will be able to process 300,000 tonnes of non-recyclable waste per year – sufficient to divert at least 95% of Oxfordshire’s residual municipal waste away from landfill disposal. It will also be able to generate up to 24 MW of electricity – enough to power some 38,000 homes.

 

ADVERTISEMENT

Popular Categories

Latest news

North Sea worker dies after incident on Valaris 121 rig

A 32-year-old worker has died following an incident on an offshore drilling rig in the North Sea. Police Scotland and the Health and Safety...

CMA approval clears the way for major HSS ProService and Speedy Hire partnership

A major shift in the UK equipment hire market has moved forward after the Competition and Markets Authority approved a new commercial agreement between...

Australia’s top scaffolding projects recognised at 2025 industry awards

Australia’s top scaffolding projects have been named at this year’s Australia’s Best Scaffolding Projects Awards. The event, held during Scaff25, drew a record thirty...

In Pictures: GKR completes major temporary roof structure at HS2 Euston

GKR Scaffolding has completed a large temporary roof structure at HS2’s Euston site. The installation sits beside the live station and supports enclosed works...

UK Construction output edges up just 0.1% in the third quarter

Construction output in Great Britain rose by only 0.1% in the third quarter of 2025, according to new figures from the Office for National...

Hong Kong launches construction safety drive after serious incidents

Hong Kong has begun a city-wide crackdown on unsafe practices in the construction sector after a series of fatal and serious accidents. The Labour Department...

4D Structures and PERI UK join forces to build one of Glasgow’s tallest towers

A 21-storey student accommodation building is rising on the banks of the River Clyde, as specialist contractor 4D Structures partners with PERI UK on...

ScaffPlan launches 3D scaffold design tool within SketchUp

ScaffPlan has unveiled a new tool that lets scaffolders design and plan scaffolding projects directly in the popular 3D modelling platform SketchUp. The software, called...

Scaffolding contractors boost profits with building wrap partnership programme

Scaffolding contractors are adding a new revenue stream to their businesses through a partnership programme that allows them to profit from building wraps without...

Equinor awards £1.25bn scaffolding and maintenance contracts for onshore plants

Equinor has signed new long-term framework agreements for insulation, scaffolding, and surface treatment (ISS) services across its six onshore plants in Norway. The contracts, worth...

Latest news

ADVERTISEMENT

The magazine

Issue 27 | Past issues >>

Popular

North Sea worker dies after incident on Valaris 121 rig

A 32-year-old worker has died following an incident on...

In Pictures: GKR completes major temporary roof structure at HS2 Euston

GKR Scaffolding has completed a large temporary roof structure...

Australia’s top scaffolding projects recognised at 2025 industry awards

Australia’s top scaffolding projects have been named at this...

UK Construction output edges up just 0.1% in the third quarter

Construction output in Great Britain rose by only 0.1%...

ScaffPlan launches 3D scaffold design tool within SketchUp

ScaffPlan has unveiled a new tool that lets scaffolders...

Related articles

ITP Appoints New Sales Director to Propel Growth Strategy

Industrial Textiles and Plastics (ITP) Ltd, a leading manufacturer of scaffold sheeting and related materials, has announced the appointment of Matt Thompson as Sales Director.  The move comes as part of ITP's strategic plan...
ADVERTISEMENTS

Latest topics

Scaffolding Association Australia expands leadership team

The Scaffolding Association Australia has appointed two non-executive board...

North Sea worker dies after incident on Valaris 121 rig

A 32-year-old worker has died following an incident on...

Australia’s top scaffolding projects recognised at 2025 industry awards

Australia’s top scaffolding projects have been named at this...
ADVERTISEMENTS