COMBISAFE: Keeping construction on track when under the weather

ADVERTISEMENT

Combisafe: UBIX temporary roof

 

In the last few years the construction industry has had to deal with rising material costs, construction-related bankruptcies, reductions in government capital expenditure and constantly shrinking budgets. And with the world’s economy still in such a fragile state, building contractors all over the world are under pressure to deliver construction projects on budget, on time and on demand – whatever the weather.

As Europe’s largest industrial employer and generating almost 10% of the European Union’s Gross domestic product (GDP), the construction industry will inevitably play a crucial role in the economic recovery and so the pressure is on contractors to meet ever increasing demands. As a result, more and more construction projects need to be carried out during inclement weather months when bad weather would traditionally have caused huge delays.

During the 2010/11 winter period, Germany saw its construction output decline by a staggering 24%, with the slump largely attributed to heavy snowfall. And despite its 2011 recovery when the country’s economy grew by 3%, it contracted in the first quarter of 2012 – this time by 0.25%. Again, an unusually cold winter clearly had an impact – with February temperatures dropping below -20°C and causing temporary suspension of many German construction sites.

In France, it was heavy rainfall in February 2012 that forced many construction sites to suspend work – further delaying the country’s economic growth and recovery from its 2009 recession. These extreme weather conditions and fluctuating temperatures are fast becoming the norm all over Europe, and precipitation and wind speeds are also on the increase. In fact, it has been predicted in Sweden wind speeds will increase by 0.8m/s and winter rainfall will rise by 50mm a month over the next century.

In the UK, analysts at Barclays projected a 3.4% fall in the construction sector for the first quarter of 2012 – attributed in large part to poor weather conditions. And now with a recent study by BRE (Building Research Establishment) also predicting a 6% increase in UK wind speeds, construction output is sure to suffer unless contingencies are put in place.

COMBISAFE UBIX® temporary roof system

The challenge for contractors is simple – stop the weather to stop the delays. But as the severity and duration of weather conditions is so notoriously difficult to predict, contractors look for ways to compensate rather than negate. The most common method is to minimise the delaying effects of weather by protecting a site from the elements. One product that does just this is a temporary roof system, such as the COMBISAFE UBIX® temporary roof system.

For both contractor and client, a carefully considered build programme which takes into account the effects of adverse weather is crucial to every project’s success. However even these are subject to change, and so a temporary roof offers the contractor the additional assurance that the project remains on track.

Traditionally, construction companies forecast periods without precipitation for the completion of critical path project elements, such as the setting of concrete. Now, temporary roofs can keep sites on course and fully prevent rainwater ingress at any time of year. Whether for a short term summer project or extended use in extreme weather conditions such as rain, wind and snow, the UBIX temporary roof meets the challenge.

Flexible and versatile, the UBIX temporary roof can also feature a COMBISAFE RunWay system which means it can quickly and safely roll open to allow for plant, equipment and materials to be craned in and out as required. This system was utilised to provide weather protection at a 12 week archaeological dig at St Bartholomew’s Hospital in London, helping archaeologists to work unaffected by the weather, and in turn allowing vital construction works to continue as soon as possible and keep the £1 billion redevelopment project on schedule.

Without a construction plan in place, or a temporary roof in position, vital construction contracts will continue to be delayed by weather and contractors will feel the impact where it matters most – at their bottom line. Helping projects to stay on schedule no matter what extremities are thrown their way, temporary roofs provide vital protection for workers, machinery, tools and structures to keep projects on time and on budget.

More info @ http://www.combisafe.com

 

ADVERTISEMENT

Popular Categories

Latest news

Funeral details confirmed as NASC publishes tribute to Wayne Connolly

The National Access & Scaffolding Confederation has published a detailed obituary for its President and Chair, Wayne Connolly, alongside confirmation of funeral arrangements following...

The real value of competition in scaffolding

Anyone who’s ever worked in a management or sales position in scaffolding will tell you that competitors are always on your mind. Perhaps you...

Engineering excellence in the Alps: Pilosio’s Olympic challenge

When the iconic Zuel ski jump in Cortina d'Ampezzo needed renovation ahead of the 2026 Winter Olympics, the project demanded more than standard scaffolding...

Layher Allround supports complex heritage restoration at Royal Victoria Country Park

Layher UK has worked in close partnership with Skill Scaffolding on a demanding heritage restoration project at the Abbey in Royal Victoria Country Park,...

GEDA transport system supports renovation of Augsburg landmark

Renovation work is continuing at the Perlachturm in Augsburg, a historic city in the German state of Bavaria, close to the Austrian border. The tower,...

AK Scaffolding steps up training for Scaffold Builders Competition in Las Vegas

Manchester based AK Scaffolding has started intensive training as it prepares to compete in the SAIA's Scaffold Builders Competition, set to take place on...

Lindsey Oil Refinery assets sold as refining restart ruled out

The assets of the Lindsey Oil Refinery in North Lincolnshire are to be acquired by Phillips 66, following the collapse of its former owner,...

Breaking Barriers: Francesca Fuser on Innovation, Leadership, and Pilosio’s UK Ambitions

When Francesca Fuser sent her CV to Pilosio, she wasn't just looking for another job. She was looking for the right fit. After years...

JR Scaffold delivers specialist access for historic Glasgow statue

JR Scaffold has delivered a complex free-standing scaffold to support the full restoration of the Sir Walter Scott statue in George Square, as part...

Women say ill-fitting PPE leaves them unsafe at work

Tens of thousands of women across the UK feel unsafe, embarrassed or scared at work because they are required to wear personal protective equipment...

Latest news

ADVERTISEMENT

Magazine

Winter Issue #28 | Past issues >>

Popular

Scaffolding project manager convicted after temporary bridge collapse

A Finnish court has handed a suspended prison sentence...

JR Scaffold delivers specialist access for historic Glasgow statue

JR Scaffold has delivered a complex free-standing scaffold to...

AK Scaffolding steps up training for Scaffold Builders Competition in Las Vegas

Manchester based AK Scaffolding has started intensive training as...

Layher Allround supports complex heritage restoration at Royal Victoria Country Park

Layher UK has worked in close partnership with Skill...

Funeral details confirmed as NASC publishes tribute to Wayne Connolly

The National Access & Scaffolding Confederation has published a...

Related articles

ADVERTISEMENTS

Latest topics

Scaffolding project manager convicted after temporary bridge collapse

A Finnish court has handed a suspended prison sentence...

Funeral details confirmed as NASC publishes tribute to Wayne Connolly

The National Access & Scaffolding Confederation has published a...

The real value of competition in scaffolding

Anyone who’s ever worked in a management or sales...

Engineering excellence in the Alps: Pilosio’s Olympic challenge

When the iconic Zuel ski jump in Cortina d'Ampezzo...
ADVERTISEMENTS