Firm Fined £60,000 After Worker Falls to Death from Birmingham Church Steeple

ADVERTISEMENT

A specialist construction company has been fined £60,000 following the death of a worker who fell from a church steeple in Birmingham.

David Clover, 64, was employed by Ecclesiastical Steeplejacks Ltd to perform restoration work on the 60-metre-high steeple of St Nicholas’ Church, Kings Norton, on 13 November 2020.

While suspended in a ‘bosun’s chair,’ a work positioning seat, he fell and suffered fatal injuries.

An investigation by the Health and Safety Executive (HSE) revealed that the bosun’s chair lacked a suitable backup system, such as a twin-leg lanyard fall arrest harness, to prevent falls.

The company, which has since ceased trading but was previously based in Stirchley, Birmingham, pleaded guilty to breaching the Work at Height Regulations 2005.

Image credit: HSE

The hearing, held at Birmingham Magistrates’ Court on 15 January 2025, resulted in a £60,000 fine.

In sentencing, Judge Quereshi criticised the firm’s outdated approach to managing health and safety, highlighting the preventable nature of the incident.

HSE inspector Emma Page expressed condolences to Mr Clover’s family and emphasised the ongoing risks associated with working at height.

“Falls from height remain one of the leading causes of work-related deaths and injuries in Great Britain. We will take action against companies that fail to protect workers.”

Statistics from the HSE show that 50 people died from falls at height in 2023/24. Updated guidance on mitigating these risks is available on the HSE’s website.

This prosecution was conducted by HSE enforcement lawyer Julian White and paralegal officer Imogen Isaac.

SM Newsdesk
SM Newsdeskhttps://www.scaffmag.com
The staff at ScaffMag.com the leading scaffolding site for a digital generation.

Most popular ↑

NASC ends muddle over ‘basic’ scaffolding definition

The trade body for scaffolding contractors has launched an...

HS2 Euston scaffolding tender withdrawn

The £2.5m to £5m scaffolding package for demolition work at HS2 Euston is no longer open for bids.

Scaffold Innovations: GapClamp™

  Since the Work at Height Regulations 2005 came into...

SG4:10 We Think The Answer Is Fast Guard™

If Carlsberg made advance guardrails.....  could this be the...

Scaffolding supplier Tube Monkeys goes into liquidation

Kent-based Tube Monkeys Scaffolding Supplies has entered voluntary liquidation, with company documents estimating a £142,000 shortfall for creditors.

Latest news

Scaffold sheeting blocks boiler flues at London flats

Gas engineers shut down boilers at a Hoxton housing block after scaffolding and plastic sheeting obstructed flues, raising the risk of carbon monoxide building up.
- Advertisement -
More from

Scaffold sheeting blocks boiler flues at London flats

Gas engineers shut down boilers at a Hoxton housing block after scaffolding and plastic sheeting obstructed flues, raising the risk of carbon monoxide building up.

Investigation after Chatham scaffolder dies in Plumstead fall

Steven Farr, 47, died after a fall while erecting scaffolding in Plumstead. HSE and the Metropolitan Police are investigating, KentOnline reports.

Swiss scaffold agreement aims to make loading limits clearer

SGUV and Suva have developed a Swiss usage agreement covering material and heavy-load scaffold platforms, with loading limits, handover checks and client duties.

NZ to end public scaffold certificate register in WorkSafe handover

Employers face direct certificate checks as WorkSafe takes over New Zealand’s scaffolding CoC scheme. Existing cards will remain valid until expiry.
Latest articles