Shortlist Revealed for the Prestigious NASC Awards 2023

Scaffolding trade body The National Access and Scaffolding Confederation (NASC) has unveiled the final shortlist for this year’s NASC Awards 2023.  The esteemed awards ceremony is scheduled to be held on November 17th at the illustrious Park Plaza Westminster Bridge in London. The event promises a night of recognition for industry innovators, trailblazers, and emerging talents. Here’s a snapshot of this year’s nominations: Scaffolding Ancillary Service of the Year Award 
  • iPhorms
  • Fulcrum Scaffold Safety
  • Smart Scaffolder (CADS)
  • StrikeSoft
NASC Apprentice of the Year Award 
  • Cameron Rowswell – GKR Scaffolding
  • Darrin Pryde – Lyndon SGB
  • Jack Kirkcaldy – iScaff Access Solutions
  • Mark Mileson – Lyndon SGB
Health & Safety Award
  • Laura Hardie – Bilfinger UK
  • Malachi Beasley – LTC Specialist Scaffolding
  • Peter Humenny – GKR Scaffolding
  • Queen’s Tower Delivery Team – JDC Scaffolding
Innovation of the Year Award 
  • Benchmark App – Benchmark Scaffolding
  • Ideal Cantilever – Ideal Scaffolding (Southern)
  • Liftbot – Kewazo
  • ScaffFloat – Towfloatwork
NASC President’s Award
  • Adrian Rooney – Midland Scaffolding Services
  • Kellyanne Conway – JR Scaffold Services
  • Luke Caldicott – Lyndon SGB
  • Phil Wise – GKR Scaffolding
Scaffold Design of the Year Award 
  • Agile Design Consultancy – Wakehurst Place, London
  • Enigma Industrial Services – Taf Fechan Viaduct, Merthyr Tydfil
  • Rise Scaffold Services – Kings Chapel Cambridge
  • Tubular Techniques – HS2 Ruislip Sustainable Placements
Project of the Year Award (Small)
  • CWR Scaffolds – Bradford Live!
  • Narford Scaffolding – Elizabeth Fry Wing, HMP Norwich
  • Rise Scaffold Services – Kings Chapel Cambridge
  • Shield Environmental Services – The Crescent Centre, Bristol
Project of the Year Award (Medium)
  •  Bryson Scaffolding – Melksham House, Wiltshire
  • Connect Scaffolding – Pierhead Lock, London
  • D+R Group – Wakehurst Place, Haywards Heath
  • JDC Scaffolding – The Queens Tower Imperial College, London
Project of the Year Award (Large)
  • Altrad Services (UK) – Polar Crane Construction Enclosure, Hinkley
  • Bilfinger UK – T333 Sphere Inspection, Grangemouth
  • GKR Scaffolding – Portland House, London
  • Lyndon SGB – Manchester Town Hall
The NASC awards are revered in the industry for their transparent and rigorous judging process. A panel of independent, respected professionals from the industry is tasked with selecting the winners. As the countdown begins, industry insiders and scaffolding enthusiasts alike eagerly await the momentous occasion to honour the best in the business. For more details and a complete list of nominations, visit the official link here.

Scaffolder Wins Tribunal Over London’s Low Emission Zone

0
A scaffolder has won a tribunal after he raised questions about the legality of signs for London’s Low Emission Zone (Lez). Noel Willcox, who runs Elevation Access Scaffolding based in Hertfordshire, faced fines totalling £11,500 for operating his company truck in and out of its depot in Harefield, North West London. As per the Lez regulations, drivers of heavily polluting vehicles, like certain vans and HGVs, are levied charges up to £300 per day. Willcox, defying the fines, approached a tribunal with his grievance. The tribunal subsequently judged that Transport for London’s (TfL) signage for Lez wasn’t “authorised and lawful.” In an interview with national media, Willcox recounted the ordeal, expressing concerns about the clarity of the scheme’s signage, especially for visitors from outside London. During the pandemic, Willcox’s company unexpectedly accrued £11,500 in fines. “One of my drivers was driving through the Lez and was captured by the cameras, which we were unaware of.” Subsequently, the fines spiralled. “On a HGV, you’re required to pay £100 every time you enter the Lez, and failure to comply results in a £1,000 fine”, Willcox said. Compounding this, Royal Mail service disruptions during the pandemic meant the company remained oblivious to the accumulating fines. “If the £1,000 isn’t settled within the stipulated time, the fine skyrockets to £15,000”, Willcox highlighted. He voiced his frustration with TfL’s response, which implied the driver’s responsibility to stay updated about polluting zones, especially given the ever-changing landscape of roadworks and closures. Upon further investigation, Willcox stumbled upon discrepancies in the signage. He pointed to the Road Traffic Regulations Act, which clearly mandates a red and white ‘C’ to denote charging zones, a directive seemingly ignored in the Lez zones.  “In contrast, the Dartford charge is clearly marked. How are drivers, especially those from outside London, expected to discern the charges?” he questioned. In a statement, TfL emphasised that the Department of Transport had approved these signs over ten years ago. They also promised a probe into why specific evidence wasn’t presented during the tribunal. Drivers operating vehicles below the minimum emissions standards in the zone are mandated to pay a £12.50 daily fee or face a £180 penalty. This fine is halved if settled within 14 days. Furthermore, TfL has rolled out a £160 million initiative enabling various stakeholders, including residents and small businesses, to avail grants if they scrap non-compliant vehicles.

TRAD UK Takes on Autumn Charity Challenges

0
TRAD UK, which has raised more than £100,000 for local and national charities over the past few years, is planning its charity challenges for the autumn as part of 2023’s fundraising campaign. TRAD is supporting Marie Curie Cancer Care, Anthony Nolan and Cancer Research UK – all charities chosen by staff, and has already completed a couple of challenges this year, in addition to ongoing fundraising within its depots and offices. “Last year’s golf day was a tremendous success,” says Ros Howe, Director of HR at TRAD. “We were so delighted to see our customers take part, and we’re really pleased that we are already nearly fully booked for this year’s event in September.” Alongside the golf day, TRAD has a team of runners preparing for the Bournemouth Half Marathon, which takes place on October 8th. “Many of our people find that training for an event like this is a great way to manage both their physical and mental health,” says Ros. “We’ve encouraged as many people as possible to think about taking on this challenge – not just for our charities but for themselves too.” “It’s important to everyone at TRAD to support these great causes,” adds Colin Dobson, MD at TRAD UK. “From Women’s World Cup sweepstakes to our corporate golf day, our people go above and beyond to help us raise money. We are very grateful to them and to the customers and suppliers that have also supported us so far this year.” If you would like to donate to this year’s fund, just go to: https://app.collectionpot.com/pot/trad23/

Layher Advances Scaffolding Production with Innovative Plant 3 Galvanising Facility

Layher, the world’s largest system scaffolding manufacturer, has completed its inaugural immersion in its new hot-dip galvanising facility at Layher’s brand-new Plant 3 in Güglingen-Eibensbach, Germany. This significant move signals the onset of official production at the new facility this autumn and is expected to be a game-changer in extending the lifespan of Layher’s scaffolding products. Stefan Stöcklein, the production director at Layher, explained the importance of the hot-dip galvanising process. “By immersing our products in zinc, we ensure they benefit from superior corrosion protection. This not only enhances the quality and longevity of our systems but also amplifies safety on construction sites,” he remarked.

A Sustainable Leap Forward

In the broader context, this ultra-modern and eco-friendly facility promises an expanded annual galvanisation capacity – a leap from 170,000 metric tons to a whopping 290,000 metric tons. The move comes as Layher responds proactively to surging demand, ensuring dependable supplies for its customers. Having employed hot-dip galvanisation since 1965, Layher’s commitment to longevity is evident. Stöcklein noted, “Several of our clients have successfully utilised their material stocks for over three decades. Post-use, these components can seamlessly re-enter the recycling stream.”

Embracing Technological Excellence

Layher’s new Plant 3 boasts state-of-the-art technology, including a computer-regulated zinc coating furnace and an automatic crane system, ensuring seamless operations. It mirrors the company’s dedication to sustainability, with waste heat recovery measures, maximised insulation, and an auxiliary heater powered by photovoltaics to curb fossil fuel reliance. Layher, the world's largest system scaffolding manufacturer, has completed its inaugural immersion in its new hot-dip galvanising facility... Before its commissioning, the plant underwent rigorous environmental impact assessments, ensuring negligible harm to the surrounding ecosystem. Advanced measures, such as comprehensive filtration systems and facility encapsulation, ensure emissions remain substantially below the stipulated limits.

More than Just Business

Layher’s Plant 3 isn’t just a testament to the company’s industrial prowess but also underscores its commitment to the environment and the local community of Germany’s Zabergäu region. As Stöcklein asserts, this expansion is crucial to meet customer needs timely, especially for pivotal infrastructure projects like wind turbines. To counterbalance any environmental impacts, initiatives backed by the owner families, Langer and Layher, include the relocation of wildlife, development of green spaces, and roof afforestation. A noteworthy project involves the restoration of the river Zaber, with the creation of diverse habitats to foster aquatic, amphibious, and terrestrial life. In a world where industries grapple with balancing growth and sustainability, Layher’s strides with its Plant 3 may set a precedent for many to follow.

Pilosio’s Flydeck System Offers New Possibilities in Under-Deck Operations

Ahead of Pilosio’s upcoming CAD Design Event in Aberdeen, Flydeck’s innovative design, versatility, and safety features are attracting industry attention from experts. Mark Parkin, Business Development Manager at 48.3 with over 35 years of industry experience, has hailed Pilosio’s Flydeck system as a ‘game-changer’ in the world of under-deck and bridge structures. In an interview with Scaffmag, Mark, who is Pilosio’s engineering partner in the UK, highlighted Pilosio’s innovative Flyrail guide and minimal scaffolding components, “The Flyrail makes it distinctive, using a minimum number of scaffolding components and chains makes Flydeck one of the simplest systems on the market today. Innovation at its best,” he said.

Versatility and Safety

“The adaptability of the Flydeck system knows no bounds; it can be integrated into any complex steel or concrete structures, showcasing its immense versatility,” Mark noted. He further commented on the system’s safety features: “Flyrail is the key to installing and removing the system, due to the way it supports the beams and reduces the number of operatives required, thus ensuring a safer working environment. Although extreme weather conditions necessitate monitoring and typically preclude any work, the Flydeck system enhances safety during installation and removal, even in challenging environments.”
Mark Parkin

Compatibility and Customisation

Mark also highlighted the system’s compatibility with other scaffolding solutions, “Flydeck can work with all ring systems, O and U type decks collaborate seamlessly with them, and it easily integrates with tube and fitting, making Flydeck the most integrated system on the market today.” He also praised its customizability, saying, “The intelligent Flydeck system has no limits and can be easily installed on any project of any scale, because of how light the system is, the faster it is to install; the only limitation is how creative your mind is. Let your imagination FLY.”

Training and Certification

In light of the upcoming CAD Design Event in Aberdeen, Pilosio is offering a 20% discount on its Flydeck Training Course. Mark shared details about the course, “At the training facility in Aberdeen, the course gives a full practical overview of the Flydeck system components, including the methodology for erecting and dismantling the platform bays, safety netting, cantilevers, and installing the chains. The course has both practical and theoretical tests, with a final grade of 80% required to pass.” As the construction industry continues to evolve, the Flydeck system by Pilosio stands out as a pioneering solution that aims to transform under-deck operations, setting new standards in safety, versatility, and efficiency. With its upcoming CAD Design Event in Aberdeen, Pilosio is poised to showcase this revolutionary system to industry professionals, demonstrating its potential to redefine the landscape of scaffolding and suspended access solutions.

Teeing Up Perfection: Event & Media Structures and Layher Excel at LIV Golf

In every great sporting event, the invisible hands of logistics, architecture, and teamwork work tirelessly behind the scenes to orchestrate the spectacle. At the recent LIV Golf Tournament in London, these hands belonged to Event & Media Structures Ltd, guided by the strategic insight of Sales Manager, Matt Bowler. With the world-renowned Layher Allround Scaffolding System as their primary tool, Bowler and his team were instrumental in transforming the venue into an international stage for golfing excellence.

The Building Blocks of the Tournament

The LIV Golf Tournament, globally acclaimed for its professional golfing spectacle, called for an infrastructure backdrop that would match its grandeur. Matt Bowler’s team rose to the occasion, leveraging their expertise to build temporary structures specifically tailored to the tournament’s needs and brand identity. Their work ranged from the creation of viewing platforms and media structures, ensuring that not a single moment of the gripping action was missed by both media teams and viewers at home. “Strategically placed camera towers to visually captivating scoreboards, every element was meticulously designed to enhance hospitality and optimum viewing,” stated Bowler.

Challenges, Solutions, and the Role of Layher

Like every great undertaking, the construction and installation of these structures presented its fair share of challenges. The sheer size and complexity of these structures imposed logistical hurdles. However, through a detailed project management plan and close collaboration with experienced engineers and other construction professionals, Event & Media Structures Ltd overcame these obstacles. Here, the Layher Allround Scaffolding System proved to be a game-changer. As Bowler explains, “The system offers a wide range of components and configurations that can be easily adapted to suit different requirements and site conditions.” This flexibility enabled them to efficiently design and construct structures that met specific needs, delivering not just on time but also on quality. The service and advice from the Layher UK team, notably after-sales, technical advice and support, were readily provided and an integral part of the delivery success.

Safety and Adaptability: Keys to Success

Safety, a non-negotiable in every construction project, was given prime importance. The team adhered to strict safety measures, including risk assessments, site preparation, assembly procedures, regular inspections, and maintenance. The golf course’s unique characteristics and London’s capricious weather demanded adaptability from Bowler’s team. Factors such as line of sight, elevation, and stability were considered in the design of camera towers. Moreover, the structures were constructed using weather-resistant materials to withstand London’s unpredictable weather patterns.

Collaboration and Project Timeline

Collaboration played a pivotal role in the successful completion of the project. Regular updates were maintained through various communication channels, including project management tools and WhatsApp. The project, from inception to completion, spanned several months. “We installed, clad, and branded approximately 50 structures around the course within seven weeks, with the derig taking just three weeks,” shared Bowler.

Looking Ahead

Reflecting on this experience, Bowler sees how this high-profile project will influence their future ventures. “Participating in a prestigious event like LIV golf provides Event and Media structures with an excellent platform to showcase our capabilities and expertise,” he stated. As a company committed to quality, innovation, and customer satisfaction, Event & Media Structures Ltd is not just setting the stage for sporting events but also raising the bar for future industry standards.

Bonus Payment Secured for Fawley Construction Workers

0
Unite, the UK’s construction union, has successfully secured an agreement that will see all construction workers at the Fawley oil refinery in Hampshire receive bonus payments.  Beginning on 1 September, over 300 Unite members covered by the National Agreement for the Engineering Construction Industry (NAECI) will receive a bonus payment of £1.63 per hour. The agreement comes after Unite members and colleagues from the GMB union staged a series of strikes at the Fawley site late last year. In a move to maintain harmony and prevent division on the site, Unite has also arranged for the same hourly bonus to be paid to over 100 workers operating under the civil engineering agreement at the refinery. Additionally, eight workers who are not part of either agreement will also receive the payment. Unite general secretary Sharon Graham praised the deal, saying, “The bonus payment deal at Fawley is an excellent example of how Unite’s focus on jobs, pay and conditions is having a direct financial benefit for our members.” Although the current agreement stipulates that the bonus will be paid for four months until the end of December, Unite representatives are already planning a campaign to extend the payments for a longer period. Unite regional officer Malcolm Bonnett expressed his gratitude to the union’s representatives and members at Fawley, stating, “This deal would not have been possible without the hard work and dedication of Unite’s reps and members at Fawley. Unite is determined to build on this deal and to continue to increase its industrial strength on the project.”

PERI UK Powers Depots with Solar Energy

In a significant move towards climate protection, system scaffolding giants PERI UK has installed Photovoltaic (PV) cells at its three logistics depots across the United Kingdom. The initiative is a part of PERI’s comprehensive climate protection strategy, which aims to reduce emissions in the long term, minimise climate-related risks, and avoid environmental damage. The solar panel project was initiated at their Glasgow site, followed by its headquarters in Rugby, and finally at the flagship depot in Brentwood.  The use of solar energy ensures that toxic chemicals are not released into the atmosphere, thereby reducing greenhouse gas emissions. This initiative aligns PERI with its commitment to becoming a greener and more environmentally responsible company. Since the Glasgow site’s solar project went live in early June, an average of 88% of the energy used on site has been sourced from the PV system, says PERI UK.  This has resulted in the production of 34,000 kWh of renewable energy, equivalent to the average annual energy consumption of 11 households, and a reduction in CO2 emissions equivalent to planting 400 trees. PERI UK’s Rugby site, which went live towards the end of June, has seen an average of 80% of its energy sourced from the PV system. This has generated 39,000 kWh of renewable energy, equivalent to the energy consumption of 13 households annually, and a reduction in CO2 emissions equivalent to planting 460 trees. Although the Brentwood site solar project was only recently completed, PERI is optimistic about the forthcoming results. For over half a century, PERI has championed sustainable entrepreneurship, making it the cornerstone of its corporate activities and success. This latest initiative underscores PERI’s commitment to environmental sustainability and its ongoing efforts to combat climate change.

IKEA Unveils World’s Largest Blue Bag Scaffold Wrap at Oxford Circus

IKEA has teamed up with Embrace Building Wraps to showcase a colossal FRAKTA bag scaffold wrap design at Oxford Circus. The bustling Oxford Circus has long been known as a shopping epicentre, and now it’s home to a new and impressive visual centrepiece: a giant-scale printed scaffold banner featuring IKEA’s signature blue FRAKTA bag, designed and executed by Embrace Building Wraps. This majestic installation, draping the former Topshop location, comes as part of IKEA’s media initiative to promote its new store, set to open next year. The journey began back in February when discussions were initiated between Embrace and the client’s agencies, Mother London & HELO. Five of the six unique sections portray a shadowy line depiction of the building itself, maintaining the recognisable Westminster City Council street nameplates in their authentic spots.  The crowning glory, however, is the last segment: a life-like blue FRAKTA bag that spans a whopping 662 m2 with three-dimensional handles reaching lengths of 32 metres and widths of 1.8m. Just to put this mammoth project into perspective, the installation necessitated 1,000 linear metres of scaffold tubes and 2,400 m2 of environmentally-conscious PVC-free (Kavalan Sunlight Weldable) scaffold wraps – a space equivalent to 44 double-decker buses. Positioned in such a prime locaction, the bold installation is sure to capture attention. Over 1.3 million vehicles traverse the area monthly, and a staggering 121,000 pedestrians flock to the nearby Oxford Circus station daily. Greg Forster, Managing Director at Embrace Wraps, remarked, “Being entrusted with such a high-profile project for IKEA at this iconic location has been truly exhilarating. Our team seamlessly coordinated everything, from the innovative design to installation. The standout FRAKTA bag is sure to ignite conversations both in the streets and online.” But it’s not just about showmanship. Embrace Building Wraps, in partnership with Ecologi, has committed to planting 2,400 trees, mirroring the banner’s footprint, in their global forest initiative.  Additionally, upon the wrap’s removal, plans are already in place to repurpose the material, ensuring a sustainable lifecycle. We will stay tuned to report more on this sustainable endeavour in the future.

Safety and Access Attains CISRS Accreditation for London Training Centre

0
Scaffold training provider Safety and Access has achieved a significant milestone by obtaining the Construction Industry Scaffolders Record Scheme (CISRS) accreditation for its state-of-the-art training centre in Earlsfield, London. The CISRS, known for its stringent assessment process, is an industry-respected body that ensures facilities maintain the highest standards in both quality and safety. Achieving this accreditation indicates that Safety and Access have met these rigorous benchmarks. The Earlsfield training centre is strategically located in London, providing easy access for learners. Situated just one stop from Clapham Junction and directly connected to Waterloo via Earlsfield station, the centre’s location makes it convenient for participants across London. Designed to accommodate a range of training needs, from beginners to advanced practitioners, the facility boasts expansive classrooms and hands-on practical areas. Current courses on offer include:     CISRS COTS     CISRS SCAFFOLD REFRESHER/CPD     CISRS BASIC SCAFFOLD INSPECTION     CISRS ADVANCED SCAFFOLD INSPECTION     CISRS SCAFFOLDING AWARENESS George Gilbert, General Manager of Safety and Access, commented on the achievement, “The CISRS accreditation for our Earlsfield centre reinforces our commitment to maintaining and delivering the highest standards in scaffold training. With established centres in Nottingham and Humberside, our London facility further positions us to serve the needs of professionals in the field.” This development is seen as a reflection of Safety and Access’s ongoing endeavour to lead in scaffold training. As the construction industry undergoes constant evolution, training centres like these play a crucial role in ensuring professionals are equipped with the necessary skills to navigate the industry’s challenges.