Pyeroy scaffolding is well under way with Ensign Platform

Advertisement

GATESHEAD, UK – Heerema Fabrication Group is using Pyeroy scaffolding during the fabrication of the Ensign platform in Hartlepool, UK. The 700 metric ton (772 ton) jacket and 550 metric ton (606 ton) topside module are for Centrica.

The Seaharvester-type platform will go 80 km off the Norfolk coast to Ensign gas field, and is scheduled to come onstream in the second half of this year.

Via: www.offshore-mag.com
Advertisement